My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138141
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE138141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:45 PM
Creation date
11/26/2007 7:06:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
Permit File
Doc Date
11/4/2002
Doc Name
Permit Application
From
Oldcastle SW Group Inc. dba Four Corners Materials
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After mining of Area 3 is complete, the operation will now move to the upper bench, where Areas 4 <br /> <br />• <br />r ~ <br />U <br />and 5 will be mined. These areas have considerably more overburden than the previous three min- <br />ing areas on the lower bench. <br />The table below shows the drill data and average thicknesses for Area 4: <br />Area 4 <br />Hole # SoiUOverburden <br />Depth Gravel Thickness Total Depth <br />2 21.0 18.0 39.0 <br />3 22.0 16.0 38.0 <br />4 22.0 21.0 43.0 <br />8 21.0 23.0 44.0 <br />Average 21.5 19.5 41.0 <br />Since Area 4 is 40.6 acres in size, an average depth of 21.3 feet yields 1,395,000 cy of <br />soiUoverburden. Part of the topsoil will be stored in 2 stockpile aeeas immediately east and north of <br />the pit, as shown on Map C-2. The volume stored here is 34,000 cy and 3100 cy, respectively. This <br />soil will be used in combination with the 49,170 cy stored in the south topsoil stockpile to place a <br />cover on the industrial pads and lake slopes for fmal reclamation. Therefore, the total soil stock- <br />piled for pad reclamation is 86,270 cy. Part of this soil will be used to cover graded areas once they <br />aze completed. The land pads will be seeded and mulched although they may be disturbed for in- <br />dustrial sites a short time later. Part of the overburden and topsoil from Area 4 will be backfilled in <br />part of Areas 1, 2 and 3 to create the 3H:1 V sideslopes azound the lake and a peninsula of Land for <br />industrial use. The remainder of the soil and overburden will be used to backfill the slopes of Area <br />4 and provide fill for some areas that will be made into land pazcels after reclamation. <br />Mining will then proceed to Area 5, the fmal area of mining. For the mining of this area, the facili- <br />ties (which are portable), will be moved to the backfilled portions of area 1,2 or 3 to allow Area 5 to <br />be mined. The table below shows the drill data and average thicknesses for Area 5: <br />15 Road Pit 10/02 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.