My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138126
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE138126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:44 PM
Creation date
11/26/2007 7:04:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 09 Protection of the Hydrologic Balance
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RUN-OFF VOLUME - - POND F <br /> PRECIP DIRECT RUN-OFF <br />ACRES CURVE AMOUNT RUN-OFF VOLUME AF <br />94.2 83 1.6 0.44 3.43 <br />136.7 58 1.6 0.00 0.04 <br />TOTAL REQUIRED WATER VOLUME 3.47 <br />SEDIMENT VOLUME <br />USING THE UNIVERSAL SOIL LOSS EQUATION <br />A= R K L S C P <br />R = rainfall factor 30.00 <br />K = soil erodibility factor 0.21 <br />LS = combined length slope factor 3.5% - 2000' 1.05 <br />C = cropping management factor 1.00 <br />P = erosion control practice factor 0.50 <br />A = sediment tons/acre/year 3.31 <br />THREE YEAR SEDIMENT VOLUME ACRE FEET <br />230.9 Acres 115 #/Cubic Feet 0.91 <br />• TOTAL REQUIRED SEDIMENT POND F CAPACITY -- AF 4.38 <br />PEAK FLOW CALCULATIONS <br />The following peak flow calculations were compiled with <br />the computer program STORM version 6.21. Details of the <br />run-off calculations are shown on the following pages. <br /> 10-YR 25-YR <br /> 24 HR 24 HR <br /> Event Event <br />Area CD-3E 3.84 14.80 <br />Area CD-2E 2.94 4.88 <br />Area CD-lE 10.21 16.97 <br />Area CD-1W 4.93 8.20 <br />Area Pond F 17.51 <br />Peak flow for Pond F spillway 62.36 <br />Four collection ditches will be constructed to collect <br />and channel the run-off to sediment pond F. Ditch CD-3E <br />feeds CD-2E which feeds CD-lE. The peak flow in the <br />ditches will be as follows: <br />Ditch CD-3E 3.84 <br />. <br />Ditch CD-2E 6.78 <br />Ditch CD-lE 16.99 <br />Ditch CD-1W 4.93 <br /> 9-28 <br />July 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.