Laserfiche WebLink
• <br />DITCH.WIil EXHIBIT 9 <br />HAUL ROAD DRAINAOE <br />The haul road culvert is to be placed in the dry wash <br />between mining areas No. 1 & 2. This culvert receives run-off <br />from a portion of drainage Area E. The size of the borrow <br />ditches is checked below. For calculation purposes it is <br />assumed that each ditch will receive run-off from the 50' width <br />of the roadway. With relief drains every 1000', the ditch <br />drainage area is 1.1 acres. <br />PEAK FLOW CALCULATION <br />• <br />DRAINAGE AREA (ACRES) <br />CURVE NO. <br />STORM EVENT _1'R. , 24 HR. <br />STORM EVENT in. <br />RUNOFF in. <br />WATERSHED RELIEF ft. <br />Lc 25 ft. <br />Lc 50 ft. <br />Lc 75 ft. <br />WATERSHED SLOPE <br />SLOPE ADJUSTMENT FACTOR <br />LENGHT OF WATERSHED <br />EQUIVALENT DRAINAGE AREA <br />PEAK FLOW cfs/in Fig D-2 <br />ADJUSTED PEAK FLOW <br />BORROW <br />CULVERT 1 DITCHES <br />46.4 1.1 <br />80 90 <br />10 10 <br />1.6 1.6 <br />0.34 0.76 <br />90 <br />1375 <br />1350 <br />1600 <br />4.8 6.00 MAXIMUM <br />1.03 MODERATE 1.07 <br />2600 1000 <br />67 14 <br />50 18 <br />12.03 1.23 <br />Use a 24" diameter CMP or equivalent to handle the 12 cfs flow. <br />Place rip rap at outlet and inlet of CMP to prevent downcutting <br />HAUL ROAD BORROW DITCHES <br />FLOW IN A TRIANGULAR CHANNEL - 1% SLOPE <br />• <br />ENTER DEPTH D 0.600 FEET <br />ENTER SLOPE S 0.010 EXPRESS AS DECIMAL <br />ENTER "N" N 0.030 EXPRESS AS DECIMAL <br />ENTER SIDE SLOPE X 2.000 SLOPE = X: 1 <br />AREA=(W*D)+(X*D"2)= 0.72 FEET"2 <br />WETTED PERIMETER=(W)+2((XD"2+D"2))".5 2.68 FEET <br />R=AREA/WETTED PERMITER 0.27 <br />V=(1.49/N)*(R".667)*(S".5)= 2.07 FEET/SEC <br />Q = A X V = 1.49 CFS <br />Q REQUIRED 1.23 <br /> 9-21 <br />