Laserfiche WebLink
• <br />SEDB.WK1 <br />SEDIMENT POND B CAPACITY <br />Sediment pond B is constructed in the north central portion <br />of the permit area. Sediment ponds B contains the run-off <br />from the central portion of the permit area. Based on the <br />following calculations, sediment pond C is not required <br />since sediment pond B can contain the run-off from the <br />entire drainage area. Sediment pond B is constructed <br />in Section 33 Creek. Sediment pond B is sized to handle the <br />run-off from both drainage areas B & C. The emergency <br />spillway for pond B is sized to handle the calculated peak <br />peak flow from drainage areas B & C. <br />• <br />RUN-OFF VOLUME - - POND B <br /> PRECIP DIRECT RUN-OFF <br />ACRES CURVE AMOUNT RUN-OFF VOLUME AF <br />208.1 83 1.6 0.44 7.59 <br />148.9 58 1.6 0.003 0.04 <br />357.0 Drainage Areas B & C <br />TOTAL REQUIRED WATER VOLUME 7.63 <br />SEDIMENT VOLUME <br />USING THE UNIVERSAL SOIL LOSS EQUATION <br />A= R K L S C P <br />R = rainfall factor 30.00 <br />K = soil erodibility factor 0.21 <br />LS = combined length slope factor 3.0% - 2000' 0.71 <br />H = 260 L = 8750 S = 260/8750 = 3.Oo <br />C = cropping management factor 1.00 <br />P = erosion control practice factor 0.50 <br />A = sediment tons/acre/year 2.24 <br />• <br />THREE YEAR SEDIMENT VOLUME ACRE FEET <br />357.0 Acres 115 #/Cubic Feet 0.96 <br />TOTAL REQUIRED SEDIMENT POND CAPACITY -- AF 8.58 <br />9-6 July 1992 <br />