Laserfiche WebLink
~i <br /> <br />RECLAMATION COSTS <br />Kirtright Pit <br />UNIT COST NUMBER OF UNITS COST <br />Topsoil Replacement (0.35/ C.Y. 10,245 C.Y. (3,586.00 <br />Seed Costs (53.21 /AC 12.7 AC f 676.00 <br />Labor cost far seeding i 10.00/AC 12.7 AC 3 127.00 <br />Total Reclemotton Costs (4,389.00 <br />