My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138106
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE138106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:43 PM
Creation date
11/26/2007 7:01:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 07 ARCHAEOLOGICAL RECONNAISSANCE WORK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />support facilities. <br />The access route to the entrance of the Sylvac:cr Gulch Adit <br />• <br />is from the east end of the Bcar ]:i:~c following a rigl:e-of-:aay <br />fir a distance of approximately 10,000 feet. The access rouC~ to the ];t. <br />Gunnison Mine # 1 is from [he i:est end of the Bcar Nine follossins e <br />right-of-way for a distance of appr~xic:ately 2,400 feet. The areas <br />encompassed by the coal preparation plant s!te, three proposed d;;rn <br />sites ar..d the related im-react areas are illustrated in I'i~ure 1. <br />Areas i:~aoediately adjacent to the fepz:.t localities were also in•:es[i- <br />gated. 1".~e total surface area ir.~to]ved in the recor.:~aissance e~uou^t~ <br />to approximately 310.3 acres. <br />Ioca[icn <br />The }•roject area is about ore and une half (1 ) air miles <br />• <br />east-soc~heast of Sci:ersat, Colorado in Sactic:s 9, 10, 15, 16, 21, <br />and 22 0: To:.:iship 13 South, F.3nge 90 West. princiyal drainages <br />incl~Ge the per4.anent straam, 2torth Fork of the Gunnison Ri•:er and <br />its t-ib~[ary, [he. eyhtW=rat str:4x, Sylvester Gulch, <br />i'7te proposed entrance pad to Sylvester Gulch Adit is located <br />in the SF'4SS•li{ of Section 15. It is to be connected ,to Colorado <br />highway 133 through tl~e present Bear Mine by a proposed access route <br />that trends north for approximately 5000 fee[ to the SW~SW} of <br />Section 10, then west for approximately 1500 feet to the S%~SF~ <br />of Section 9. <br />T'he proposed codl preparation plant site -survey area is <br />~J <br />located in the S~SE~; of Section 9 a:~c the SW~S;?~ of Section 10. To <br />the south, in the lid of Scc[ion 15 is the proposed d~~r~p site survey <br />area. Tl:e ine support facilities survey area (FiS;:re 2) lie:, in tha <br />LdE'j`:S'~ of Section to anu [he 57SE~ of Section 9. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.