Laserfiche WebLink
VOLUME 8A <br />•_ SURFACE DRAINAGE/MINE FACILITIES APPENDICES <br />TABLE OF CONTENTS Page 1 of 2 <br />DIVERSION APPENDIX <br />CAPACITY OF CHANNEL <br />Sewage Water Holding Pond Certification <br />Orchard Valley West Mine Pond Certification <br />Sedimentation Dam Construction Specifications <br />MONITORING <br />Sedimentation Pond Monitoring Program <br />STRUCTURAL <br />Sedimentation Ponds Structural Inspection Program <br />Specifications for Construction of Diversion Channel <br />SOIL LOSS EQUATION STUDY <br />Soil Loss Equation Study <br />PONDS, IMPOUNDMENTS, AND DAMS APPENDIX <br />Pond Repair Plan - Ponds 1 - 4 <br />West Ridge Waste Disposal Fill Certification <br />Waste Area Pond Certification <br />Sedimentation Ponds 1 - 4, Timber Storage, Stockpile and <br />Loadout Ponds Certification <br />STABILITY ANALYSIS <br />Sedimentation Pond Stability Analysis <br />•°'• SPILLWAY CAPACITY <br />_ Spillway Capacity Calculations <br />POND VOLUMES <br />Sediment Pond Volume Calculations <br />SEDIMENT LEVELS <br />Sedimentation Pond Clean-Out Level Calculations <br />STOCKPILE RUN-OFF CALCULATIONS <br />SEWER PLANTS APPENDIX <br />• <br />.ti . <br />N.P.D.E.S. PERMIT APPENDIX <br />MINE FACILITIES APPENDIX <br />Orchard Valley Mine Haul Road Certification <br />Orchard Valley West Mine Haul Road Certification <br />Figure 2.05-1 - Crushing S Screening Flow Diagram <br />Figure 2.05-2 - Coal Storage b Train Loadout Flow Diagram <br />Figure 2.05-3 - Road Surfacing Cross Sections <br />Figure 2.05-4 - Typical Inlet Ditch Relief Culverts <br />Foundation Design Criteria for Proposed 200,000 Gallon Water <br />Storage Tank Report, Golder Associates, September 1986 <br />Proposed OVWM Water Pipeline Map <br />Map of Colorado Westmoreland Inc. Water Storage Tank, <br />Paonia, CO, Armstrong Consultants, Inc., October 1986 <br />Proposed Powerline R.O.W. Map <br />TR 96-028 <br />i ~' -Z8/ RN-o 3 <br />Rev. 03/29/96 <br />A/I~2ovE~ ~~/~y~q~ <br />