Laserfiche WebLink
a <br />TASK 7 ~. <br />PAGE 1/3 <br />• SEAR CANYON FAH AREA <br />1. <br />Demolition volume Qnit Coat Total Cont <br /> <br />Fan Building (metal) 0 p <br />Hater Tank 62,832 Sq. Ft. #•18/Sq. Ft.1 #11,310 <br />Concrete Intake Portal 50 Cu. Sd. 59.81/Cu. id. 2,991 <br />Concrete Return Portal 28 Cu. id. 59.81/Cu, id. 1,675 <br />Concrete Pad 13 Cu. id. 41.25/Cu. id. 536 <br />Substation Pad 40 Cu. id. 41.25/Cu. id. 1,650 <br />Total Demolition Coats #18,162 <br />2. Culvert Removal <br />2.1 Fill to be moved 7fi4 cy <br />2.2 Produotion rats <br />Cat 225 azcavator 2 112 oy/hr. <br />2.3 Job efficieaoy factor .90 <br />2.4 Het produotioa rata 101 cy/hr. <br />2.5 Time ragmred <br />2.5.1 Tim t~ ezoavate 8 hr. <br />2.6 Cost psr hour #64 <br />2.7 Cost to remove oulverta #510 <br />3. Gradiau and comcaotion <br />3.1 Oolime of Material (1.75 swell !actor) 7,147 cu. yds. <br />3.2 Prodnotica Rate Cat D-6 Dozer (50' push) 540 ou. yd./hr. <br />3.3 Job Efficiency Factor .90 <br />3.3.1 'Operator Efficiency Factor .90 <br />3.4 Het Production Rate 438 cu. yd./hr. <br />3.5 Time Required 17 hrs. <br />3.6 Operating Cost per Hour #91 <br />. 3.7 Equiymeat Hob. t Dmob. 0 <br />3.8 Total Grading and Compaction Costs 1,544 <br />