My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137953
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137953
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:33 PM
Creation date
11/26/2007 6:47:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
11/22/2002
Doc Name
pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and drilling fluids aze generally te-circulated. Shaft boring and casing of the approximate 20' diameter <br />ventilation shaft are conducted as separate operations. Asurface-mounted drive unit is used to turn a <br />• rotary cutting head attached to a shaft extending from the surface through the pilot hole, and a hoist on the <br />temporary headframe is used to maintain continuous upwazd pressure on the cutter head. As boring <br />progresses, the cuttings aze dropped down the shaft bore and aze recovered, transported, and placed in <br />mined-out areas underground. An alternate to transporting the cuttings to mined-out azeas will be to <br />slurry them into the EMD sump. An underground line will be installed and the cuttings slurried to the <br />EMD and pumped behind the seals in 7, 9 or 10 Right. If the underground development waste cuttings aze <br />not placed underground they will be transported to the surface via the existing conveyance system and <br />then will be stored south of the old pit. The cuttings volune will be approximately 21,000 cy (16,862 cy <br />swelled by 25%). The cuttings will dischazge off of the existing rock belt where they will be loaded into <br />trucks and hauled to the previously approved overburden storage area (see Map 24 for locations). This <br />overburden storage area is in a previously disturbed sire and within TCC's existing sediment control <br />system. The overburden storage area is located on a gentle slope to the south of pit 1 (old pit). These <br />cuttings were mixed with coal during conveyance from the mine and therefore will be washed to recover <br />the coal. It is anticipated the cuttings and coal will comprise 5 - 10% of the monthly volume of ]ow <br />quality coal processed through the wash plant. The cuttings will then be part of the refuse stream coming <br />from the plant. The fines generated during the washing process of the cuttings/coal will be dischazged <br />underground as part of the thickener underflow. The course segment will be placed in the refuse pile. <br />Given the fact that the fines from the cuttings/coal will be processed through the plant and the fines <br />disposed of underground in the thickener underflow it is not necessary to conduct a geotechnical analysis <br />of the material going to the refuse pile. The fine segment was the reason for committing to conducting a <br />geotechnical analysis, but they no longer will be placed in the refuse pile. <br />• Once the cutter head breaks through to the surface within the shaft collar, the cutter head, drive unit, and <br />temporary headframe will be disassembled and removed from the site. A permanent shaft casing <br />consisting of steel ring beams and liner plate will be placed and the annulus between the liner and the <br />shaft bore will be cemented in segments after boring operations progressed to the surface. <br />The cement shaft liner will serve to isolate the Twentymile Sandstone from the Wadge Overburden. <br />Additionally, it is planned to pressure grout the Twentymile Sandstone to prevent seepage from it into the <br />shaft. This will further ensure that after final closure the water in this unit will be confined and not seep <br />down on the inside of the shaft.Following completion of shaft boring and casing operations and removal <br />of equipment from the site, the fan enclosure (fan shroud) and electrical control building will be erected <br />on either the previously constructed or new concrete pads and the fan, fan drive motor, and electrical <br />control, monitoring, and communication systems will be installed. Average pad thickness will be 2' and <br />total pad surface azea will be approximately 3100sf. The installed axial-vane exhausting ventilation fan <br />has a capacity of 800,000 cfm with a 3000 hp drive motor. A fence will be constructed to enclose the fan <br />installation. Following commissioning, the shaft pad site and access road will be cleaned-up and surface <br />areas graded and dressed <br />Concurrent with road construction a power distribution line will be extended from the existing substation <br />to the pad-mounted transformer at the shaft site. The power distribution line is approximately 3,600' long <br />with a total of 12 power poles. <br />In order to minimize potential environmental and aesthetic impacts associated with the NW Mains <br />• ventilation shaft and fan installation, surface drainage at the shaft site will be handled by an upgradient <br />diversion ditch, perimeter berms, and gravel surfacing under an SAE, the limited road drainage will be <br />handled by designed drainage structures, active use areas aze graveled to control dust and drainage, other <br />MR 02-179 2.05-45.2 08/06/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.