Laserfiche WebLink
• C I R L E S Cast Estimating Software • <br />EARTHNORK FORM - BULLDOZER NORK <br />____________________________________ <br />____________________________________ <br />Agency or organization name Colorado Division Of Minerals 8 Geology <br />Task # 003 State Colorado Permit # : M-99-042 <br />Dale 08/11/99 County Pi 14tH Abbr. : none <br />User ESC Site Nhite Banks Hine Filename M042-003 <br />Permit/job ac[i on Neu 110(2) Permit <br />________ <br />______ <br />_______________ <br />_____ <br />_____________ <br />_____ <br />_ <br />Task description ___ <br />_ <br />Replace topsoil on disturbed areas ____ <br />HOURLY EOUtPMENT LOS7 Basic machine Cat 08N (1996) Horsepower 285 <br />_____________________ Blade type Semi-Universal ---------- <br /> Attachment #1 ROPS Cab Shift basis: 1/day <br /> Attachment #2 3-shank ripper ---------- <br /> Utilization 5 (CRG) <br />Lost Breakdown Ownership 5/hour 543.08 NA <br />-------------- Operating 5/hour 554.94 100 <br /> Ripper op.S/hour 50.00 0 <br /> Operator 5/hour 523.12 NA <br /> Total unit 5/hour : 5121.13 Total fl eet 5/hour 5121.13 <br />MATERIAL QUANTITIES ~P2~OY Ce,.q ~ ~~ <br />_______ <br />Initial Swell Loose <br />volume : <br />947 CCY factor 1.115 volume - <br />1,056 LCY <br />-- --- <br />Source of quantity [ake-off Operator -- <br />Estimate ---- <br />-- <br />- <br />Source of es[. swell factor CAT Handbook- Earth Loam <br />HWRLY PRODUCTION <br />________________= Job Condition Correction Factors <br />Avg. push distance 100 f[. -------------------- ------------- <br /> --------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Ma[. consistency.. 1.00 (CAT HB) <br />dozer production 803 LCY/hr Dozing method..... 1.00 (gen.) <br /> --------- VisibilitY•••..... 1.00 (avg,) <br />Material consistency description Job efficiency.... 0.83 (1sh/day) <br />Consolidated stockpil e Spoil pile factor. 0.70 (fnd-mf) <br />-------------------------------------- -Push gradient..... 0.54 (CAT NB) <br />Avg. push gradient 20.00 Y. (pos) Altitude derati on. 1.00 (CAT HB) <br /> --------- Material neigh t... 1.10 (CAT HB) <br />Avg. site altitude 6,800 ft. Blade type........ <br />_ 1.00 (S or U) <br /> <br />Material weight ______-__ <br />2,100 lb/LCY __________________ <br />Net job correction ______________ <br />0.26 <br />Mat. description --------- ------------- <br />Earth - Loam <br />____ <br />_____ <br />______ <br />____ Adjusted unit prod.: <br />_ 208.81 <br />__ LLY/hr <br />_______ <br />_____ _ <br />______ <br />Adjus[ed fleet production __- <br />_____-_- <br />208.81 <br />LCY/hr <br />JOB COST ------------- <br />Fleet size 1 Dozers ) Total joh time 5.06 Hours <br />Unit cost 50.580 /CCY total job cost 5612.54 <br />