Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />H. EARi N(IORK <br />Task No.~ <br />[. EARTHWORK <br />cask No.l <br />S TP,EAM CHANNEL RECONSTRUCTION <br />Task Descri p[i on <br />sheet 3 of 4 <br />Cos[ (4) <br />Subtotal (N): <br />DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task Description ~ Cos[ (4) <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Oescription <br />3 <br />Replace Topsoil on Disturbed Areas <br />Subt ota( (1 ): <br />Cost (E) <br />~ 4613 <br />Subt otaf (!): E613 <br />