Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />DRAPER-ONLY WORK <br />Agenry or organization name :OMG <br />Tasks: 002 Stale :Colorado PertniUjob s:M-2001-033 <br />Dale: 05/022007 County :Otero Abbmwabon :none <br />User: BMK Sile:Rough Cul Filename :M033-002 <br />Pertnil or other job action :NEW PERMIT <br />Task description :SPREAD TOP SOIL <br />Model :Car 637E Series 2 ShiN basis : 1 per day <br /> <br />Cost Breakdown : Job u lllizalion % Horsepower : 740 <br />Ownership cosVhour: 378.29 NA <br />Operating cost/hour: 3159.56 100 Weight (UST) : 56.76 <br />Operator cosVhour: $28.1H NA Cost data source : (CRGf <br />Total unit costlhour: $266.03 Total lleet cosVhour: $266.03 <br />MATER <br />AL O <br />I <br />UANTRIES <br />Initial <br />Swell <br />Loose <br />volume: 52.940 LCY factor: NA volume: 52.940 LCV <br />Source of quanliy uke~oN :EXHIBIT L <br />Source of estimated swell factor : NA <br />Hauling CaoaciN: <br />Scraper Payload (weight) Basis <br />Material weigh : 2,100 pounds/LCV <br />Material tlascription <br />Earth-Loam <br />Rated payload: 75.000 pountls <br />Payloatl capacry: 35.71 LCV <br />Bowl (volume) Basis <br />Struck volume: 21.00 LCY <br />Heaped volume: 3100 LCV <br />Average volume: 26.00 LCY <br />Adjusted capacity : 26.00 LCY "' <br />Cvcle Time l loatl+haul+soread +reluml: Loading time: 1.50 minutes' <br /> Maneuver and spreatling lime : 0.60 minutes <br />Travel time : ' loedinp time per pair on push-pull models <br />Route I Distance (IeeQ I Gratle (%) Roll. res.(%) Total res.(%) Velocity (Ipm) Travel lime (min.) <br />Haul: 3.000 2.0 8.0 10.0 987 3.16 minutes" <br />Retum: 3,000 -2.0 8.0 6.0 2.717 7.40 minutes" <br />"travel lime atllusted for acceleration entl Oecelerauon at loatl antl tlump points <br /> Total rycla time : 6.66 minutes <br />Job Contlltion Cortection Factors <br />Site altitude (feet) : 4,500 <br />Altitutle adjustment laclor : I. W <br />Job e6icienry factor: 0.83 <br />Net job correction lactor : 0.83 <br />Adiustetl HouM Protluction <br />Unatljusted unit production : 234. I6 LCVMour"' <br />Atljusted unit production : 794.35 LCVMour <br />Adjusted fleet production : 194.35 LCVMour <br />Z times volume on push-Dull motlels <br />JOB TIME AND COST <br />Fleet size: / Scraper(s) <br />Unit cost: 31.369 /LCV <br />Total lob lime : 272.40 Hours <br />Total job cost : $72,466 <br />