Laserfiche WebLink
1. Approval has been granted by Huerfano County for a Conditional Use <br />Pemut. A signed copy of their decision is enclosed. <br />2. An Air Pollution permit will not be needed since we will remove less than <br />70,000 tons per year from this site. <br />3. This is an open pit operation and ground water will not be exposed so a <br />well permit and temporary supply plan is unnecessary. <br />4. A dredge fill permit (404) is not required because there are no waters of <br />U.S. on this site. <br />5. A Storm Water Management Plan (SWMP) will be prepared for this pit if <br />there is a potential for surface water leaving the site. <br />6. A NPDES permit to cover stormwater runoff and dewatering is not <br />required, all stormwater will be retained on site and allowed to soak into the <br />substrata. <br />