My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137879
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:29 PM
Creation date
11/26/2007 6:41:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200723000
IBM Index Class Name
Permit File
Doc Date
9/27/2007
Doc Name
NOI Application
From
Blue Mountain Energy
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{7) The cost of any required recovery of such fossils <br />shall be borne by the United States. Copies of al] <br />paleontological resource data shall be provided to the Regional <br />Director, OSMRE. <br />(8) Individual actions such as road construction, <br />power line pole placement or ventilator shafts will need to be <br />examined on a case-by-case basis to determine what impacts if <br />any will occur to fossil resources. <br />(c) Resource Recovery and Protection. (t) <br />Nohvithstanding the approval of a resource recovery and <br />protection plan (R2P2) by the BLM, lessor reserves the right <br />to seek damages against the operatodlessee in the event (i) the <br />operator/lessee fails to achieve maximum economic recovery <br />(MER) (as defined at 43 CFR 3480.0-5(21) of the recoverable <br />coal reserves or (ii) the operatorlessee is determined to have <br />caused a wasting of recoverable coal reserves. Damages shall <br />be measured on the basis of the royalty that would have been <br />payable on the wasted or unrecovered coal. <br />(2) The parties recognize that under an approved <br />R2P2, conditions may require a modification 6y the <br />operator/lessee of that plan. !n the event a coalbed or portion <br />[hereof is not to be mined or is rendered unmineable by the <br />operation, the operator/lessee shall submit appropriate <br />justification to obtain approval by the AO to leave such <br />reserves unmined. Upon approval by the A0, such coalbeds <br />or portions thereof shall not be subject to damages as <br />described above. Further, nothing in this section shall prevent <br />the operator/lessee tiom exercising its right to relinquish all or <br />portion of the lease as authorized by statute and regulation. <br />(3) In the even[ [he AO determines that the R?P2, as <br />approved, will not attain MER as the result of changed <br />conditions, the AO will give proper notice to the <br />operatodlessee as required under applicable regulations. The <br />AO will order a modification, if necessary, identifying <br />additional reserves to be mined in order to attain MER. Upon <br />a final administrative or judicial ruling upholding such an <br />ordered modification, any reserves left unmined (wasted) <br />under that plan will be subject to damages as described in the <br />first paragraph under this section. <br />(4) Subject [o the right to appeal hereinafter set forth, <br />payment of the value of the royalty on such unmined <br />recoverable coal reserves shall become due and payable upon <br />detemunation by the AD that the coal reserves have been <br />rendered unmineable or at such time that the operator/lessee <br />has demonstrated an unwillingness to extract the coal. <br />(5) The BLM may enforce this provision either by <br />issuing a written decision requiring payment of the MMS <br />demand for such royalties, or by issuing a notice of non- <br />compliance. A decision or notice ofnon-compliance issued <br />by the lessor that payment is due under dtis stipulation is <br />appealable as allowed by law. <br />(d) Additional Mitigation Measures. (1) <br />Applicable mitigation from the Blue Mountain Energy <br />Inc., Mining Permit Application-Deserado Mine Plan will <br />remain in full force and effect for any resources. <br />(?) The operator is responsible for informing all <br />persons who are associated with the project operations that <br />they will be subject to prosecution for knowingly disturbing <br />historic or archaeological sites, or for collecting artifacts. <br />If historic or archaeological materials are uncovered <br />during any project or construction activities, the operator <br />is [o immediately stop activities in the immediate area of <br />the find [ha[ might Further disturb such materials, and <br />immediately contact the authorized officer (AO). Within <br />Fve working days, the AO will inform the operator as to: <br />• whether the materials appear eligible for the <br />National Register of Historic Places <br />• the mitigation measures the operator will <br />likely have to undertake before the site can be <br />used (assuming in situ preservation is not <br />necessary) <br />• a timeframe for the AO to complete an <br />expedited review under 36 CFR 800-11 to <br />confirm, through the State Historic <br />Preservation Officer, that the findings of the <br />AO are correct and that mitigation is appropriate. <br />If the operator wishes, at any time, to relocate activities to <br />avoid the expense of midgation and/or the delays associated <br />with this process, the AO will assume responsibility-for <br />whatever recordation and stabilization of the exposed <br />materials may be requ'ved. Otherwise, the operator will be <br />responsible for mitigation cost. The AO will provide technical <br />and procedural guidelines For the conduct of mitigation. Upon <br />verification from the AO that the required mitigation has been <br />completed, the operator will then be allowed [o resume <br />construction. <br />(3) Pursuant to 43 CFR 10.4(8) the holder of this <br />authorizadon must notify the AO, by telephone, with written <br />confirmation, immediately upon the discovery of human <br />remains, funerary items, sacred objects, or objects of cultural <br />patrimony. Further, pursuant to 43 CFR t0.4{c) and (d), you <br />must stop activities in the vicinity of the discovery and protect <br />i[ for 30 days or until notified to proceed by the authorized <br />officer. <br />(41 Due to the age of the first inventory and the <br />
The URL can be used to link to this page
Your browser does not support the video tag.