Laserfiche WebLink
<br />Mining Plan Map Includes: <br />A. /Permit Boundaries <br />/Legal Description <br />~~ <br />Exhibit E -Mans <br />B. /Mined Land Owners of Record <br />/Resource Owners of Record <br />/Structures within 200ft Owners of Record <br />C. /Major Surface Features <br />/Ezisting and Proposed Roads <br />/Pit Boundary <br />/Topsoil Stockpiles <br />/Overburden Stockpiles <br />XProduct Stockpiles <br />XWaste Rock Fills <br />/Stream Channels <br />XBuildings <br />XProcessing Plant <br />XUnderground Openings <br />XPonds, Impoundments <br />XDewatering Pumps and Diversions <br />XWaste Disposal Areas <br />D. / Direction of Mining <br />E. /Location of Man-made Structures within 200ft <br />F. /Previous Disturbances <br />Reclamation Plan Map Includes: <br />A. /Gradient of Reclaimed Slopes <br />B. XNon-revegetated Areas and Trees/Shrubs <br />C. XShorelines and shallows for Pond Areas <br />D. XThickness of Replaced Overburden <br />s III IIIIIIIIIIIIIIII <br />E. /Thickness of Replaced Topsoil <br />