My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137803
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:25 PM
Creation date
11/26/2007 6:35:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004022
IBM Index Class Name
Permit File
Doc Date
6/28/2004
Doc Name
Response to Adequacy Review Comments
From
J B Engineering LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L: Reclamation Cost Estimate <br />RAINDANCE RESERVOIR (East Pit) <br />Item Quantity Cost Total <br />Overburden replacement/backfill 66,200 yds3 $0.40 yd3 $26,480 <br />Topsoil Replacement 29,750 yds3 $0.40 yd3 $11,900 <br />Grading Stockpile 8 Plant Site' (If no <br />surcharge reservoir) 6.0 acres $200 /acre $1,200 <br />Seeding -reservoir cut slopes 3.3 acres $400 /acre $1,320 <br />Seeding-Stockpile & Plant site' (If no <br />surcharge reservoir) 6.0 acres $400 /acre $2,400 <br />Pond Dewatering _ _ 600 ac-ft_ $60/ac-ft _ ___ $36,00_0 <br />Clay Liner Excavation, Placement, <br />Conditioning and Compaction 161,300 yds3 $1.00 /yd3 $161,300 <br />Construction QA/OC 1 $25,000 $25,000 <br />Direct Cost $265,600 <br />Insurance, Performance Bond and Profit <br />(15%) $39,840 <br />Total Cost $305,440 <br />SURCHARGE RESERVOIR (West Pk) <br />Item Quantity Cost Total <br />Overburden replacement/backfill 71,250 yds3 $0.40 yd3 $28,500 <br />Topsoil Replacement 7,000 yds3 $0.40 yd3 $2,800 <br />Grading Stockpile & Plant Site' (If surcharge <br />reservoir is constructed) 6 acres $200 /acre $1,200 <br />Seeding -reservoir cut slopes and fill areas 5.2 acres $400 /acre $2,080 <br />Seeding-Stockpile & Plant site' (If surcharge <br />reservoir is constructed) 6.0 acres $400 /acre $2,400 <br />Pond Dewatering 100 ac-ft $60/ac-ft $6,000 <br />Clay Liner Excavation, Placement, <br />Conditioning and Compaction 44,300 yds3 $1.00 /yd3 $44,300 ', <br />Construction QA/OC 1 $15,000 $15,000 <br />Direct Cost $102,280 <br />Insurance, Pertormance Bond and Profit <br />(15%) $15,342 <br />Total Cost $117,622 <br />The re-grading and re-seeding of the stockpile IocaGons and the plant site location shall occur only once, and is a <br />function of the surcharge reservoir construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.