Laserfiche WebLink
sheet t of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DRMS <br />002 State : Colorado <br />05/15/2007 County : Yuma <br />ESC Site : Bennett Pd <br />PermitJjob # : M-2007-021 <br />Abbreviation :none <br />Filename :M021-002 <br />Permit or other job action :New 110 Permit <br />Task description :Replace Topsoil <br />_,: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 523G <br />-Push dozer.NA <br />Support equipment -Load area : NA <br />-Dump area ~ Cat 08R Sedes 11 - 8SU (2005) <br />Road maintenance -Motor grader :NA <br />-W Ater truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA NA <br />°f° Utilization-machine : 100 NA NA 50 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cast/hour • $67.15 NA NA $51.18 NA NA <br />Operating cosNhour : $91.22 NA NA $36.87 NA NA <br />Ripper op.cosUhour: NA NA NA $0.00 NA NA <br />OperatorcosUhour: $24.95 NA NA $32.78 NA NA <br />Unit subtotals : $183.32 NA NA $120.83 NA NA <br />Number of units : 1 0 0 1 0 0 <br />Group subtotals : Work : $183.32 Support : $120.83 Maintenance : $0.00 <br />Total work team cosUhour : 6304.15 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,088 LCY factor ; NA volume : 3,088 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :NA <br />