My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137788
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:24 PM
Creation date
11/26/2007 6:34:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007021
IBM Index Class Name
Permit File
Doc Date
5/15/2007
Doc Name
Cost Summary Form
From
DRMS
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />COST SUMMARY FORM <br />nVY~V• IYLI~111 IV/~IIV I~ / <br />Date : 15-May-2007 ,/ Permit or job no. <br />User : ESC Abbreviation <br />Filename <br />Agency or organization name :ORMS <br />Permit or iob action :New 110 <br />M-2007-021 ~ Site :Bennett Pit v <br />none State :Colorado <br />M021-000 County :Yuma <br />TASK LIST (DIRECT CO5T51 FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Bac~ll and Grade to 3h:1v Slopes dozer 1 25.5 $4,026 <br />002 -Replace Topsoil scraped 1 8.1 $2,477 <br />003 -Revegetate AI/ected Area revege 2 40.0 $3, 745 <br />004 -Mobilization/Demobilization mobilize 1 4.7 .53.329 <br />includes inflation factor adjustment of <br />NA <br />~/a <br />SUBTOTALS: 78.4 <br />TOTAL DIRECT COST <br />OVERHEAD AND PROFIT • Llabillty IRSUranCB : 2.02 % o(direct total = $274 <br />Performance bond : 1.05 % of direct total = $143 <br />JD6 superintendent : NA' NA NA total = NA <br />Profit : 10.00 % o/direct total = $1,358 <br />'not required (a eqp. operator serves es super.) TOTAL O 8 P = $1, 775 <br />LEGAL • ENGINEERING • PROJECT MANAGEMENT • CONTRACT AMOUNT (direct F O 8 P) _ $15,352 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management andlor administration : 5.00 % of cntr. NA total = $768 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted ror at task level TOTAL INDIRECT COST= $2,542 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $18,119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.