My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137785
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:24 PM
Creation date
11/26/2007 6:33:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
1999 Addendum to 97/98 Landslide Corrective Measure
Section_Exhibit Name
Exhibit 14C Appendix H
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />• <br />using Figure HS-12. Based upon the measured velocities, the following LVC's were assigned: <br />(1) Spring of 1997, LVC = 2.8 <br />(2) Spring of 1998, LVC= 2.7 <br />(3) Spring of 1999, LVC=2.3 <br />Coefficient of Variation of Velocity Class. The mean LVC was assumed to have a coefficient of variation <br />of 30 percent. <br />1997 Probabilities. Using the mean LVC of 2.8, assuming a normal distribution and a coefficient of <br />variation of 30%, the LVC values associated with the four movement outcomes were normalized, the azea <br />each condition occupied under the normal distribution curve was computed, and probabilities were <br />calculated for each expected outcome. Probabilities of outcomes using 1997 conditions are summarized in <br />Table H3, column 3. Computations of probabilities using LVC's aze provided in Appendix H5. <br />1998 Probabilities. Probabilities were revised based upon 1998 movement data and a mean LVC of 2.7. <br />The revised LVC outcomes were normalized against this new mean and the areas these values occupied <br />under the normal distribution curves were computed. These areas correspond with the probabilities <br />assigned to each outcome. Probabilities of outcomes using 1998 conditions are summarized in Table H3, <br />column 4. <br />1999 Probabilities. Probabilities were revised based upon 1999 movement data and a mean LVC of 2.3. <br />The revised LVC outcomes were normalized against [his new mean and the areas these values occupied <br />under the normal distribution curves were computed. These areas correspond with the probabilities <br />assigned to each outcome. Probabilities of outcomes using 1999 conditions are summarized in Table H3, <br />column 5. <br />H7.2.3 Probability Based Upon Bayes' Rule. <br />Bayes' Rule says that probabilities for outcomes can be revised based on additional information that is <br />Barr Engineering Company <br />PCDOCS1208220/CAK <br />July 31, 1999 <br />27 Appendix H <br />1999 Addendum to <br />1997198 landslide Coneetive Measures Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.