Laserfiche WebLink
<br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Divrsion or Water Resources <br />Department of Natural Resources <br />1313 Sherman Street. Room 818 <br />Denver, Culurado 8020] <br />Phone 130319b6~3581 <br />Fn% (}0}l 85fi-3589 <br /> <br />..OF~~O(7`v <br />/4i ~~` <br />r~T/ ~O\ <br />+`'9,r .1 <br />•~~ <br />Response to Reclamation Permit Application Consideration <br />DATE: January 4, 1999 <br />TO: Carl B. Mount, Sznior Environmental Protection Specialist <br />CC: Division 2 Office; Dtstric[ 1 I Water Commissioner RECEIVED <br />FRONt: Kathleen L. Sullivan ~?' JAN 0 4 7999 <br />RE: Pine Ridge Pit, File No. N1-98-104 Division of Minera158Geolor <br />Operator: ACA Products, ' <br />Contact Chuck Murphy (7i9)39~-3790 <br />Section 7 & l8, Twp 10 S, Rng 8U W, 6th P.M., Lake Counry <br />CONDITIONS FOR APPROVAL <br />1w Romer <br />Governor <br />Mmes 5. for-hhevl <br />&ecuo.e U~rei;or <br />Hal U Simp~an <br />9arr Enymcer <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: See comments below. <br />COMMENTS: If stormwater runoff is intercepted by this operation or after reclamation, and it is not <br />diverted or captured in priority, it must be released to the stream system within three days. This may require <br />a discharge permit from CDPHE-WQCD. Otherwise the operator will need to make replacements for <br />zvapomtion. <br />The reclamatton plan involves leaving depressions. Thz operator must ensure no ground water is exposed in <br />thz pit during mining, or in the reclaimed pit, by maintaining the lowest zlevation of the pit or deprzssion at <br />least 18" above thz htghzst local levzl of the water tablz. <br />The applicant indicated the operation would use water for aggregate washing operations from the Ciry of <br />Colorado Springs. The applicant will need to ensurz that the operation obtains this water from a propzrly <br />decreed source for such industrial uses. <br />Thz applicant may contact the State Engineer's Office with any questions. <br />