• <br />Stegner Presentation Outline <br />I) Initial Application. <br />2) Informal Conference. One attendee, Jan Boddicker. <br />Issues brought up in the conference: noise, dust, lraffi~: all outside of DMG jurisdiction. <br />Water quantity/effect on off-site structures, end land-t se questions: within DMG jurisdiction. <br />Still awaiting first response to Tech. Adeq. Review at that time. <br />3) Objectors: Major & Ian Boddicker (withdrawn after Informal Conference), Ginger & Dave Slatten, <br />Bernard Henrie (verbally withdrawn); Jack Dickson. <br />4) May 12, 1999 inspection. <br />A few things noted; needed new map with the irtigation ditch and better boundaries drawn. All other <br />notices and pre-excavation conditions noted. <br />5) Pre-Hearing Conference (no objector attendees). <br />Two issues (water quantity/effect on off-site structure:.; end land-use) adequately addressed by the <br />consultant by this time. Slurty wall will require a tech;tical revision to allow DMG to review the <br />specifications (currently in County review process), and the Operator must stay 2' above the water <br />table until OSE issues are resolved. Otherwise, no out::[anding technical issues with DMG. <br />Agenda for Board Hearing drawn up and times assign~;d for each issue, as well as rebuttals. <br />6) Effects on Water Quantity/Off-site structures: <br />Slurry wall may cause impoundment; however, there is a groundwater monitoring plan now in place to <br />measure the effects, and the site will be drained if it ruches a certain trigger point (2' below the <br />surface, the point at which the landowner notices damage to his house, the nearest structure). <br />7) Recommend for approval of permit on July 2, 1999. Bond set at $179,100.00 (20% of slurry wall costs <br />for fixing, plus costs for reclaiming 25 acres of the sitt at a time). <br />