Laserfiche WebLink
EXHIBIT "B" <br />' MINING PLAN <br />BLM SCORIA PIT -NORTH OF I,OMA <br />(A) Excavation of the pit will be done by the Division of Highways or <br />their contractor. <br />(B) The top foot of soil overburden, with native veg~£ation, will be <br />stripped from the area to be used and stockpiled for use in <br />' reclaiming the disturbed areas of the pit. <br />(C) The material to be mined is Bunzt Shale, soil, and sandstone. <br />' (D) Material will be mined from the existing face in a northwesterly ~~~tK 7 <br />direction. <br />t (E) The mined material will be hauled directly to the project. <br />(F) The backslope will be terraced with near vertical1slopes between <br />the terraces. <br />(G) The pipeline in the area will be protected by providing two more <br />feet of cover at road crossings and work areas. e <br />