Coat Methane Drainage Project - Pane(r 16-74 Wert Eck Mine • Page 2-t0 <br />helicopter access would not be operationally or economically feasible and would offer limited benefits <br />relative to incremental reduction of project-related environmental impacts. <br />2.4 CONDITIONS OF APPROVAL <br />Conditions of approval applicable to any and all alternatives are designed to prevent, control, <br />minimize, and/or mitigate potential project-related impacts and to effect Full compliance with all <br />applicable regulatory requirements and guidelines. Certain conditions of approval are specific to an <br />activity, affected resource(s), or where exceptions to lease stipulations are needed to allow the surface <br />activities necessary to support coal muilng operations. The following conditions of approval <br />(standazd mitigation measures) would be applied to all action alternatives (Alternatives 2 through 5) <br />unless noted as being specific to an activity, resource, or exception to a lease stipulation. <br />2.4.1 Road and Drill Pad Construction <br />1) Koad work will be performed only upon authorization of the District Ranger and comply <br />with the terms of MCC's Road Use Permit. Roads will be designed and constructed to <br />provide maximum stability and protect the surface resource. Best Management Practices will <br />be used in designing the roads and during construction. All roads will be upgraded or <br />constructed to USFS specified standards fox either temporary or dassiFied roads, as <br />appropriate and approved by the USFS, with a design speed of 15 mph. <br />2) MCC shall notify the District Ranger at least 24 hours in advance of operations commencing <br />on National Forest Lands unless previously approved <br />3) The responsible USFS official, prior to ground disturbance, shall review and either approve <br />or deny approval to construct any drill pad location and the final alignment for new roads. <br />Staging area locations must also be approved before use. ~~Uhen.disturbing ground in areas <br />where exceptions have been approved fox lease stipulations, MCC will provide notification at <br />least 10 days in advance. Ground review by the USFS is required prior to initiation to <br />determine if additional mitigation measures are needed in these exception areas. <br />4) Surface disturbance will be minimized to the extent reasonably feasible in order to limit <br />potential impacts. Soil that is removed from all new disturbance areas will be windrowed or <br />stockpiled for use in reclamation. Topsoil will be segregated from subsoil. No soil generated <br />from excavation, slide removal or other operations shall be deposited within the WIZ of any <br />drainage with flowing water. <br />5) Before removing an trees, the trees will be designated and the removal approved by the <br />USFS prior to removal. MCC will be charged the value of the trees removed. Controlled <br />felling techniques will be used. Any slash generated from tree removal operations shall be <br />lopped and scattered to a maximum depth of 2 feet. <br />6) MCC shall shut-down operations immediately in areas in which any antiquities or items of <br />historic or scientific interest are discovered. MCC shall bring the discovery to the attention <br />of the District Ranger immediately. MCC will comply with the National Historic <br />Preservation Act to protect any cultural resources that may be present. <br />7) All disturbed and inactive areas (cut/fill slopes) and soil stockpiles shall be seeded with a <br />USFS approved temporary seed mixture within 7 days following disturbance to prevent <br />noxious weed infestation and minimize erosion <br />8) All construction, reconstruction, and improvements will be stabilized by installation of <br />drainage structures, where determined appropriate by the responsible USFS of&dal, <br /> <br /> <br /> <br />I <br />I <br />I <br />I <br />I EnvironmentalA.creumext ' <br />u.~~-/Ab..ra~ GdG/E.r/a.,qr )l//oJ r UhT <br />J/f/01M <br />