My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137692
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:19 PM
Creation date
11/26/2007 6:23:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001017
IBM Index Class Name
Permit File
Doc Date
3/9/2001
Doc Name
CONSTRUCTION MATERIALS REGULAR 112 OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~nks and Gesso, LLC <br />the south-central portion of the property and will be maintained below existing grade so <br />that any precipitation will be retained in these areas. <br />As initial excavation approaches the mining limits, dewatering quantities will be at a <br />maximum. However, once the first areas along the perimeter are lined and reclamation <br />proceeds, the quantity of groundwater pumped should stabilize and begin to decrease. <br />Since concurrent lining of the mining perimeter will occur throughout the operation, <br />dewatering quantities should remain uniform for the remainder of extraction activities, <br />until the final perimeter is reclaimed. Additional water, secured by water rights to the <br />Rural Ditch, will be utilized for aggregate processing and as a product component in the <br />concrete batch plant. <br />Phasing Schedule for Mining and Reclamation Operations -Rule 6.4.4 (d), (e) <br />The entire project will occur in one phase. The schedule for mining and reclamation <br />follows. <br />Initial Operations <br />Everist will erect the initial concrete plant, maintenance and office facilities, and scale as <br />located on Exhibit C-3. This will involve stripping of topsoil and overburden from the <br />plant site area prior to erecting the processing equipment. The aggregate plant will be <br />erected on the site in late 2001 or early 2002. Topsoil and overburden stripped from the <br />plant area and within mining limits will be stockpiled for later use in reclamation. <br />Initial mining will create the ponds for use as process water ponds. Raw materials will <br />be stockpiled for later processing. Stripping of other portions of the site will allow for the <br />excavation of de-watering ditches, settling ponds, and setting the pumping systems. <br />Overhead powerlines and transformers will be installed to provide power for the electric <br />dewatering pumps and plant equipment. Subsequent mining will progress north and <br />then eastward into the French Property (Area C, See Exhibit C-3). Mining with an <br />approximate 1:1 slope will occur in all areas. As soon as the deposit floor in the <br />Lohmann property has been reached and enough working area exposed, clay-lining of <br />the pit edges will begin. <br />Lohmann Sand and Gravel Mine DMG.112 20055 <br />L.G. Everist, Inc March 2001 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.