Laserfiche WebLink
bl-;off <br />deposit lies on, therefor ground water will not be involved. <br />Storm runoff could be critical during mining and after recla- <br />mation causing erosion and consequent sediment deposits. This <br />has been discussed with the USDA Soil Conservation Service and <br />their recommendations in letter to Frank M. Graham, Jr. dated <br />November 3, 1981, by Carol Odegard, are acceptable to Broderick <br />& Gibbons. In addition, historic storm basins will be con- <br />structed during the mining operation so as to not change the <br />historic pattern of drainage. <br />Mining of one 40 acre phase means the location of the pro- <br />cessing plant in that area, the completion of mining that area, <br />and reclamation begun. Since the gravel deposits are spotty <br />in nature it is very likely that future adjustment in phasing <br />will be necessary. <br />• <br /> <br />