My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137683
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:18 PM
Creation date
11/26/2007 6:22:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/2/2004
Section_Exhibit Name
Exhibit 13 Bonding Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Under the maximum disturbance bond reclamation scenario, both the East and West Pits <br />would be recontoured to establish positive drainage. <br />During the next five-year bond term, Colowyo identified the bonding scenario where the <br />Section 16 final pit remains open, and the East and West Pits are at their maximum depth and <br />disturbance. <br />In order to present a bond reclamation cost estimate, which accurately represents actual site <br />conditions and the anticipated difficulty of reclamation, Colowyo has utilized standazd <br />engineering and cost estimating practices, published reference sources, and applied appropriate <br />regional adjustments. <br />3.0 METHODOLOGIES AND ASSUMPTIONS -SPECIFIC APPROACH <br />Deternnation of the bond amount necessary to provide for complete reclamation of the <br />mining disturbance azeas and associated facilities involved a series of logical steps: <br />• Identification and delineation of disturbance areas <br />• Determination and sequencing of required reclamation functions <br />• Determination of material handling requirements and delineation of haulage routes <br />• Selection of appropriate reclamation equipment <br />• Calculation of equipment productivities <br />• Determination of equipment hour and fleet requirements <br />• Development of equipment, labor, demolition, and revegetation unit costs <br />• Calculation of total costs for each reclamation activity <br />• Development of cost estimates for project overhead, contractor profit, and contract <br />administration <br />• Determination of the total bond reclamation cost <br />The following sections describe the assumptions and procedures utilized in developing <br />each component of the bonding cost estimate. <br />4.0 IDENTIFICATION AND DELINEATION OF DISTURBANCE AREAS <br />As previously noted, Colowyo evaluated specific factors, which could impact reclamation <br />costs to identify a maximum disturbance scenario. Using this scenario, Colowyo then delineated <br />all mining and related disturbance on a current topographic base map. <br />3 Revision Date: 5/8/03 <br />Revision No. TR-56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.