My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137650
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:16 PM
Creation date
11/26/2007 6:19:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001046
IBM Index Class Name
Permit File
Doc Date
4/18/2002
Doc Name
Adequacy Correspondence
From
Banks and Gesso LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:: Banks and Gesso, LLC <br />April 18, 2002 <br />Division of Minerals and Geology <br />Attn: Tony Waldron <br />1313 Sherman Street, Rm. 215 <br />Denver, CO 80203 <br />720 Kipling St.,Suite117 <br />Lakewood, Colorado 80215 <br />(303) 274-4277 <br />Fax (303) 274-8329 <br />www. banksandgesso.com <br />RE: File No. M-2001-046; Nix Sand and Gravel Mine; Owens Brothers Concrete Company; <br />Preliminary Adequacy Review Response <br />Dear Mr. Waldron: <br />We are in receipt of your second Adequacy Review, dated March 12, 2002, concerning the Nix <br />Sand and Gravel Mine. The responses to your additional concerns will follow the same order <br />presented in your letter. <br />6'.4.4 Exhibit D -Mining Plan <br />The Applicant will be placing almost all of the excess overburden back into Mine Areas Two and <br />Three once those pits have been completely excavated. Owens Brothers would like to reserve <br />the right to sell as much as 2,000 tons of overburden per year to off-site users. Backfill of the <br />remainder of the overburden will take place along the southern edges of Mine Areas Two and <br />Three. Placement of fill material in these areas will serve two purposes. One, the lake leveling <br />affect along the southern shore will be reduced by 6 to 12 inches. Two, the buffer between the <br />pond edge and the wetlands to the south of the property will be increased by approximatety 200 <br />feet. The combined affect should greatly reduce, if not eliminate, the overall affect the lake <br />leveling has on the wetlands. The mining sequence will follow the numerical order of the Mine <br />Areas depicted on the Mine Plan Map, with the plant initially located in Area Four. Once mining <br />has progressed to the initial plant location, the plant will be relocated to the northwest corner of <br />Area Six. Lastly, for the purposes of topsoil disposal during reclamation, it assumed that all <br />salvaged topsoil is placed on top of the backfill material to an average depth of 2.3 feet. The <br />overburden and backfill volumes include topsoil amounts. Amore detailed description of the <br />mining sequence follows. <br />Mine Area One -Mining will begin in Area One. The area will be stripped of topsoil and. <br />overburden. The overburden will be stockpiled in the southeast corner of Mine Area 3. The <br />dredge or dragline will initially be located in the northwest corner of Mine Area One (as far away <br />from the south road as possible). Extraction will begin in that corner and progress southward <br />towards Weld County Road 28. Approximately 99,500 CY of overburden will be recovered from <br />this area. However, approximately 111,200 CY will be needed for final reclamation. All of the <br />overburden stripped from the area will be used during reclamation, with another 10,600 CY of <br />backfill material being supplied by stripping of Area Two. The maximum amount of topsoil <br />stockpiled for this phase is 99,500 CY. <br />Mine Area Two - As with Area One, the area will first be stripped of topsoil and overburden. <br />Stripping is expected to produce approximately 270,900 CY of overburden. Approximately <br />10,600 CY of the overburden will be placed directly into Mine Area One to complete reclamation <br />of that area. The remaining overburden will temporarily stockpiled in the southwest corner of <br />Mine Area Three. Mining of Area Two will begin in the southeast corner and progress <br />northwestward towards the mining limits. Backfill of the southern portion of Mine Area Two will be <br />
The URL can be used to link to this page
Your browser does not support the video tag.