Laserfiche WebLink
-~- <br />3. The proposed mining and reclamation operations can be carried out in conformance with the <br />requirements of the Act, and the Construction Material Rules and Regulations. <br />E. The Peanittee has made a showing satisfactory to the Board: 1) that it will employ, during and after its <br />underground mining and/or surface operations, procedures designed to minimi~r. environmental disturbance from such <br />operation; 2) that it will provide for reclamation of the Affected [.ands appropriate to the subsequent beneficial use of such <br />lands; and 3) that, in the event of the failure of its proposed rcelaniation plan, it will take whatever measures may be necessary <br />to assure the success of reclamation of the lands affected by such operations in accordance with the Act. <br />F. A copy of the Pemrittee's applicator, as amended and supplemented, has been approved by the Board and is, <br />by this reference, incorporated herein. <br />G. The issuance of this permit does not relieve the Permittee firm having to comply with all applicable Federal, <br />State and County statutes, including State water law. <br />The Board, in reliance upon the representations and promises made in the pemeit application, as amended and <br />supplemented, and the perforrnauce warranty, hereby issues a life of the mine pemvt to the Pennittee, to engage in the <br />operations described in the application on certain lands lying in the County of Weld, State of Colorado. These lands are <br />described in the pemrit applicaiian, as amended and supplemented, and are referred to herein as the "Affected Lands". <br />This permit is issued subject to the following conditions and agreements: <br />1) The Pemuttee will be bound by all applicable requirements of the Act, and all applicable riles and regulations <br />of the Board, as amended from time to time, the terms of the permit apphcation, the temts of the performance warranty, and the <br />terms of the financial warranty filed with the Division. <br />2) The Pemeittce will file with the Division its annual report and fees on each anniversary date of this permit. <br />3) If analyses of the mining and reclamation operation and the data collected through monitoring and <br />experimentation by the Permittee or monitoring by the Division indicate that the operation will not be able to comply with the <br />requirements of the Act and apphcable riles and regulations of the Boazd, the Pemuttee hereby agrees to exercise its best <br />efforts, after consulting with the Division, to modify the plans to correct such deficiencies in the future. Such modifications <br />may require technical revisions or amertdmerrts to the permit. <br />4) The Board, or its authorized representative may enter upon the lands of the pemeitted operation at all <br />reasonable times for the purpose of inspection to detemune whether the provisions of the Act, Rules and Regulations, and <br />pemut have been complied with pursuant to C.RS. 34-32.5-121. <br />5) This permit may be revoked or suspended for non-compliance with the Act or applicable rules or regulations <br />promulgated by the Board, the permit, or by violation of a Board Order. <br />6) a) Pursuarrt to 34-32.5-1 I8(5) of the Act, the Board has a right of entry to reclaim the lands affected by <br />the operation, or to respond to an emergency as deferred by C.R.S. 34-32.5-121(2) <br />b) The Board will enter the lands to perform rcelamation only if the Board has determined: <br />