My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137581
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:12 PM
Creation date
11/26/2007 6:12:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
8/20/2004
Section_Exhibit Name
Exhibit 11 Colorado Discharge Permit - NPDES
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page No. S <br />Permit No.: CO-0044776 <br />• eligible for relief from TSS, total iron and SS, as applicable; however, the majority of the loading from any discharge has to <br />consist of storm mnoff for the relief to be available. The pernuttee will need to show that exceedance of the applicable <br />limitations was caused by precipitation (surface rnnoffwater) and not mine water, through a comparison ofthe loading from <br />each source. <br />• 4. Post-Minine Areas <br />Relief maybe granted for each discharge occurrence only when necessary and shall not be granted when the pennittee has <br />control over the discharge. The permittee should endeavor to meet the primary limitations whenever possible. <br />a. For active outfalls: For rainfall, to waive TSS and total iron limitations, it is necessary to prove that discharge occurred <br />within 48 hours after measurable precipitation has stopped. In additioq to waive settleable solids limitations, it is <br />necessary to prove that discharge occurred within 48 hours after precipitation greater than the 10-yeaz, 24-hour event has <br />stopped. For snowmelt, to waive TSS and total iron limitations, it is necessary to prove that dischazge occurred within <br />48 hours after pond inflow has stopped. In additioq to waive settleable solids limitations, it is necessary to prove that <br />discharge occurred within 48 hours after pond inflow volume greater than the 10-yeaz, 24-hour event has stopped. <br />b. For post-minine outfalls: For rainfall, to waive settleable solids limitations, it is necessary to prove that discharge <br />occurred within 48 hours after measurable precipitation has stopped. For snowmelt, to waive settleable solids limitations, <br />it is necessary to prove that dischazge occurred within 48 hours after pond inflow has stopped. <br />Should a precipitation event or snowmelt occur, the perntittee shall submit adequate proof in order for an exemption to be <br />claimed. Weather station data maybe appropriate in making this demonstration. Said proof shall be submitted as an <br />attachment to the Dischazge Monitoring Report (DMR) for the appropriate period. The Division shall determine the <br />adequacy of proof. As part of this determinatioq the Division shall evaluate whether the pennittee could have controlled the <br />dischazge in such a manner that primary limitations could have been met. All manual dewatering of ponds that are equipped <br />with automafic dewatering systems must meet TSS and total iron limitations. If a pond has only manual dewatering <br />capability, relief is available only to the extent required to regain necessary stability and capacity. <br />In conformance with 40 CFR 434.50, commencing at the time active min; -g has ceased and all surface areas served by a <br />sedimentation pond have been returned [o the regtiued contour and revegetation has commenced, applicable discharges may <br />be eligible for post-mining limitations. In most cases, these post-mining limitations shall remain in effect until bond release. <br />The pemilttee shall notify the Division at [he appropriate three so that consideration of permit modifications can be made. <br />Prior to notification and subsequent permit modification, active [Wining limitations will apply regazdless of actual mine status. <br />5. Comuliance Schedules <br />a. Twelve Time Analysis - Outfa11006: The pernilttee shall complete a twelve time analysis as described in Part LB.3. <br />Twelve consecutive monthly grab samples shall be collected at outfall 006 and analyzed with all results being submitted <br />at the end of the sampling period. A summary report in the form of a letter shall be submitted to the Permits Unit by <br />October 31, 2005. The perndttee may attach the laboratory results if they choose. This report shall include all sample <br />results collected over the twelve month period. If the series of sampling is incomplete, this shall be noted in the report. <br />If sampling has not yet been completed by October 31, 2005, this twelve time analysis requirement shall continue until <br />twelve samples have been collected and analyzed and the results submitted to the Permits Unit. Monitoring results for <br />the same parameters previously collected (1998 and more recent) maybe substituted for future monitoring results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.