My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137528
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:10 PM
Creation date
11/26/2007 6:09:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006A
IBM Index Class Name
Permit File
Doc Date
11/23/2005
Section_Exhibit Name
Part 778 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 778.17 (a) Continued. <br />Revised 11/20/80 <br />The proposed timetable for each phase of mining and reclamation <br />including the anticipated number of acres of land to be affected is <br />shown in Table 2, Affected Areas for `lining and Reclamation. This <br />Tab Le covers the entire area to be mined because the amount of <br />disturbance proposed during the five-vear permit term will roughly <br />coincide with the extent of the total area to be disturbed within <br />the mine plan area due to the nature of the proposed pit and the <br />preparatory work required prior to actual overburden removal. <br />(b) If the applicant proposes to conduct the surface mining activities <br />in excess of 5 years, the application shall contain the information <br />needed for the showing required under 30 CFA 786.25(a). <br /> Although the permit herein applied for will expire and be subject <br /> li <br />i <br />f i <br />hi <br />h <br /> on <br />s app <br />cat <br />ssuance, t <br />e date o <br />to renewal five years from t <br /> is full and complete for the entire mine life and corresponding <br /> Mine Plan Area. Two to three years of mining will remain at the <br /> termination of the initial permit, but because the steady state pit <br /> conditions require approximately 5,600 linear feet of active mining <br /> area to be open at any given time, 90 X of the total surface dis- <br /> turbance to take place within the Mine Plan Area will occur during <br /> the first five years as shown on Map 31a, Kerr "tine Area Soil Re- <br /> moval and Storage. Additionally, because of the extent of distur- <br /> bance all drainage control facilities will be installed during the <br /> first five years. Due to the above-mentioned facts, Kerr Coal <br /> requests that the permit boundary be coincident with the Mine Plan <br /> Area and has structured this application accordingly. <br /> Section 778.18 Personal Injury and Property Damage Insurance Infor- <br /> oration. <br />~~,j~~.234s6,> <br />'~ <br /> ~ <br />d <br />• <br /> 2 <br />` <br /> ti n-t:~.o Tsai <br /> 778-26 as cam, <br /> APPRUVEa <br /> OSHA-DO9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.