Laserfiche WebLink
~ i <br />- Gold ~ Min Adaauacv Revinv Reaoa,an JWe 21.1995 <br />I. The topsail Pile depicted m the earthead Dome of the ~8 dam that is depicted it Map &I don <br />ocnhin topaal a addborr b alnh Ihat appaaa b have barn dosed whm tle aided dam wu <br />carobuckd Acing canshucdat of the raw ®badarart, the topeal will be segregated fiaar the pile <br />and moved b the topsoil cite b the aoulh recce the mad. the aiaa6 matadal wID 6e chipped aid wed <br />6or ma4+6 a removed ~ the ails. The topsoil in tYe pie may also be pat boot m the artalope of me <br />new embard®art. <br />2. We beBeve that the right~o-mta deh wu sad vrilh the Let adegtraty reeportee wbmAtal We have <br />net heel sere b oanplele a Itbie of P utd spad6c menhariama That Dover the tayal r~ht b <br />arts fa This abmroal. We will attempt b aea/e a taNe and Abmt it b the Diviaiar a soon as <br />1• <br />In ado b naaove any oon8ids with ~ lie of the West lode damr. we have moved the graded mat <br />atookp'k and topsoil sra b n era decly in crnhd of Ct1tl, 6e. The p®it bourdtry was ahr~ed <br />b re&rt the move. Acba1 erect fa the pmait boundary and dittabad area alrt,~ed "aY lit9e and <br />should not affect the bond a erdstir~g pepawat. <br />3. COM, he. w>71 cotrtiae b wok wAh Hertlda County [.and Ilse Deparmwrt b alrtrrtr a pool <br />operatiaul aamrg fa the mr'8 burldmg. As soon as ibe aormrg m approved, be doarnenhtion wi8 be <br />Bent to the Division fa mrfirsiorr m the files. <br />4. A new vvttrf management plan camel be oanpkted in be tme avaiLble that demorrUalea a water <br />balazee fa an abnomud yew ouch a we have aeareteted tlda yarn wilhoat obtasrsig teoadt about <br />monthly mar®um preapitatian and rempaahae irfomafim ham a reprna~/rtive wedha edliaa <br />CabrrWiom have bean made m avatae doh that is avaih6le. WaaTha Brtent drla irdioalea <br />apprmasoalely 20 irrlrea of average prer~Attiar ID the general area of Veld HrZI. 7be new pond era <br />bebw the ditches aartrins 1.97 can of oooomlitUon area. 1be area below the ma~rm <br />oonfi~aation at 5 feet below the areal oartrer L32 can. The earoar>zabd nuwff for the year would <br />be 29.7 inrhas deep. (3arad avaperaliort rooadt indicate apptaaiaaldy 40 iaehet of waporttion. <br />which would evsporeh aD naaffgoirK irdo the new pad. Precipibtia- and evapanfion wadd soar <br />ova the aloe year, thaefaq the pond would certain arty oarosrktaed pradpilttim ba an ahoo®d <br />ato®(100•yr., 24-hr.) evert of 6.8 arches. Cam hn. wi ocmod b mairaiiig 2.6 bat of iroebeatd <br />b the embaalomart ant above the normal ta~a level m the new Itii~ pond The decant Brea <br />will be discantinred and pa>Ded dart whm ells rrw am6anbuak in pTaoa <br />7!e present pond era at the top of the embr~rart pmr b the presort tempoory mite of 2-bd <br />approved by your oboe is 0.4SS can. A ma>~rum preoip~en evert (loo-yr.. 24-hr) would mute <br />28,750 cu. R of water b the pond (Pa yoor irmpecticn report of 2/18193). If ra avarlabb aapaoLLy err <br />the exiaterg pond was albwad fix, the dept of wale would be 1.45 bet ff the mill wet idle, this <br />water would have b be evtpasamed end rratmaCy should pmtrnt rro problana. We would, however hie <br />b reoommard that the decent lanes be mamheed in tle prnart pad weh deorrt wader goe~g b the <br />Heart A unh7 a pemument dam raise has been cample6ed eo bat we would not enoasrter problems <br />wAh baclr-to-becY aaocros. Coro, Inc. wa cell the presad baIlchad in the lieael A eo that bee is no <br />kata®e at the rookfiu0dead intafaoe prior b use of the Head A eaaege again. <br />5. The urlet of the daunt riaae wrll be appm~awy 3-mahea above the tar~a surface. 7bia dis0arroe <br />inchdes 2-i~ohaa br the Pipe pin appreo~ately 1-i-ah fa a to od n~pla ftet wry be attarJted ao a <br />eaear that can be aaewed arto the nipple. the aaroat wi8 prevart debris and some maw from <br />artemrg the inks 7hae is sh'fi a paasi6id' y that crow and is may blodr the inlet edm this case, hot <br />water firm the mr'8 w~ tx nm thrarglr the inleh b me8 and disbdge the snow and itt. <br />6. COM, Ina. wid have quality assumooe testing done an the ®benl®art and Imo duoug 6rshtletion. <br />Cati6ed es~bralt teat rapers will be Bart b the Division. Proctor Ersta w~ lre done m. boaow mekml <br />prior b plaoanent (t lest Pa 211110 cubic yards of ~ and moisture densely tetb wr4 be doe on <br />