My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137449
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:05 PM
Creation date
11/26/2007 6:01:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005A
IBM Index Class Name
Permit File
Doc Date
9/12/2006
Section_Exhibit Name
Tab 13 Postmining Land Use
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Redamation Schedule. <br />Adion Taken <br />Performance bond posted <br />Sediment Control <br />Soil removed and stored <br />Backfilling and rough grading <br />Final grading, drainage control and stabilization <br />{see Tab 12 and Exhibit 132) <br />Graded spoil sampling (where appropriate) <br />Ripping spoil (where appropriate) <br />Phase I bond release request <br />Soil replacement <br />Soil amendments added (where appropriate) <br />Ripping w seedbed preparalion (where <br />appropriate) <br />Develop shrub and tree establishment areas <br />Seed cover crop and/or permanent seed mixes <br />Mulch (where appropriate) <br />Dovelop additional shrub and tree planting <br />areas (select habitat areas and suppression <br />of competing vegetation) <br />Plant shrubs and trees; establish mature <br />shrub Gump transplants <br />Following permanent seeding <br />Ongoing <br />After fall dormancy <br />• <br />Time Period • <br />Prior to permit issuance <br />Prior to mine disturbance <br />Prior to pit or associated mine disturbance <br />After coal removal and sufficient advance <br />of pit (maximum of 4 spoil piles or 180 days <br />following coal removal) or removal of <br />support facilities <br />See schedule of 6chibit 132, Backfill and <br />Grading Schedule <br />Upon completion of initial grading and <br />prior to soil replacement <br />Prior to soil replacement <br />Upon successful completion of <br />backfilling, grading, and drainage control <br />After suitable spoil mitigation (where <br />appropriate) and final grading and within one <br />year after final grading is completetl, provided <br />the area is not required for facilities described <br />in the Projected Reclamation Schedule sedion • <br />After soil replacement and when <br />indicated by soil test resuks <br />After soil replacement <br />After soil replacement <br />First appropriate seeding season <br />following soil replacement (fall is <br />primary seeding season] <br />TR-37 13-40 Revised 04/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.