Laserfiche WebLink
TABLE OF CONTENTS <br />contin <br />ed) • <br />( <br />u <br /> Paae <br />Bonding 138 <br />Introduction 13-48 <br />Reclamation Cost Categories 13-49 <br />Bac~lling and Grading 13-49 <br />Topsoil Replacement 13-50 <br />Revegetation 13-51 <br />Facility Recamation 13-51 <br />Structure Demolition 13-51 <br />Powerlines 13-52 <br />Facility Areas 13-52 <br />Miscellaneous Utilities 13-52 <br />Sediment Ponds 13-52 <br />Permanent Roads 13-52 <br />Indirect Costs 13-53 <br />Mobilization and Demobilization 13-53 <br />13-53 • <br />Production Shifts <br />Equipment Type 13-53 <br />Reclamation Time Frame 13-54 <br />Mobilization and Demobilization Costs 13-54 <br />Engineering Redesign Fee 13-54 <br />Contractor ProfR and Overhead 13-54 <br />Reclamation Management Fee 13-54 <br />Cost Summary 13-55 <br />Direct Cost 13-55 <br />Indirect Cost 13-55 <br />Literature Cited and References 13-57 <br /> • <br />TR37 73-iii Revised 04/05 <br />