Laserfiche WebLink
• EXHIBIT 7, ITEM 20, PART F <br />GEOTECHNICAL INVESTIGATIONS <br />The following geotechnical report, which was prepared in 2003 by CTL/Thompson, Inc., <br />describes the geotechnical conditions for two of the three sediment ponds to be built for the <br />South Taylor Mine Plan. At that time, the West Taylor Pond was not designed and the following <br />report does not discuss that structure. See the introductory letter provided in Exhibit 21, Item 1 <br />by Shannon & Wilson, Inc. which subsequently concluded that the geotechnical conditions to be <br />encountered for the West Taylor Pond are similar to those previously found in the attached <br />report. This letter further recommends that the embankment sections and construction <br />procedures would apply for the West Taylor Pond. <br />• <br /> <br />Exh. 7-20F-1 Revision Date: I/OS/07 <br />Revision No.: PR-OZ <br />