Laserfiche WebLink
n <br />u <br />r1 <br />U <br />I• <br /> <br />Cotter Corporation <br />Liberty Drilling Program <br />July 22, 1996 -Page 2 <br />Stratiaraphy <br />The following are the water producing horizons encountered in the <br />Liberty drilling program. <br />Drill Water Bearing .Est Static <br />H 1 Formation De th Thiclmess GPM* Level <br />~.~ -~ <br />IB-96-1 Burro Canyon Fm. 94' 35' <2 GPM 392' ~~ <br />~ <br />IB-96-2 Brushy Basin Mbr. 260' 20' u1 <br />> 10 GPM 572' ~ <br /> Salt Wash Mbr. 650' 40' >2 GPM* <br />7B-96-3 Brushy Basin Mbr. 110' S' Damp <br /> Brushy Basin Mbr. 255' 20' 10-30 GPM 275' . <br />IB-96-4 Brushy Basin Mbr. <br />IB-96-5 Brushy Basin Mbr. <br />IB-96-6 Brushy Basin Mbr <br />JB-96-7 Brushy Basin Mbr. <br />290' 40' 10-30 GPM 183' <br />290' S0' 10-30 GPM 160' <br />275' 35' 10-30 GPM 160' <br />255' 35' 10-30 GPM 96' <br />Note: While it is possible that the ore bearing Saltwash sand <br />(Jms) may contribute. water in the holes drilled, the volume <br />produced by the Brushy Basin Mbr. of the Morrison Formation (Jmb) <br />masks the underlying horizon. <br />*Est. GPM. All estimations are a visual guess by the driller <br />utilizing no device to measure output. <br />Zf you have any questions, please contact me. at Cotter's Nucla <br />office, P.O. Box 700, 81424, or call 970-864-7347. <br />Sincerely, <br />COTTER CORPORATION <br />~~~~ <br />R. Schwind <br />Project Geologist <br />RS/tlt <br />blmgj2.n <br />