Laserfiche WebLink
<br /> <br />RECLAMATION COST SUM4ARY cont'd sheet 3 of 4 <br />H. EARTHWOR% - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />~ ~ <br />~ ~ <br />______________________________________________________________________ <br />Subtotal (H): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL i <br />Task No.~ Task Description ~ Cost (SI <br />Subtotal (11: <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />2 ~ Spread topsoil <br />Cost ($) <br />512.663 <br />Subtotal (J): 512,663 <br />