My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137339
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:00 PM
Creation date
11/26/2007 5:51:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Permit File
Doc Date
7/15/1983
Doc Name
WASTE PILE RECLAMATION PORTION OF EAST PILE TO BE REMOVED
Section_Exhibit Name
SHEET 2 OF 5
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m- <br />m <br />Y <br />W <br />W <br />U <br />6650 <br />6600 <br />6700 <br />Y. <br />W <br />W <br />or <br />6650 <br />/ <br />6600 <br />7 <br />REMOVE PART OF WASTE MATERIAL <br />,SLOPE THE REMAINING PART 2(H) :1IV) OR FLATTER <br />SECTION 30 <br />1 = 50' <br />J REMOVE PART OF WASTE MATERIAL <br />SLOPE THE REMAINING PART 2(H): 1(V) OR FLATTER <br />SECTION 40 <br />1$I = 50' <br />S� <br />W <br />PLAN <br />1" =50' <br />6700 <br />Y <br />w <br />W <br />x <br />6650 dl <br />I <br />6600 <br />6700 <br />Y <br />w <br />W <br />6650 LI <br />RECOMMENDED LIMITS <br />OF REMOVAL\ <br />SECT ION 10 <br />1°= 50' <br />i <br />PASTE MATERIAL <br />i <br />�REMOVE ALL WASTE MATERIAL <br />SECTION 20 <br />1 °= 50, <br />a� <br />'ROXIMATE EXISTING IMITS <br />EAST WASTE ROCK PIL — <br />to <br />665 <br />EAST PILE REMOVAL NOTES <br />3.0 <br />2.5 <br />r 2.0 <br />w <br />w <br />w <br />cn <br />a <br />LL <br />O <br />In <br />w <br />O <br />U Li <br />w <br />). <br />0.5 <br />0° <br />10° 20" 3u <br />SLOPE OF THE PILE FOUNDATION <br />3UMED 5 FT. ABOVE <br />SURFACE (PILE FOUNDATION) <br />NOTES: <br />1. FACTORS OF SAFETY FOP. A PILE DEPOSITED ON TOPOGRAPHIC SURFACES OF DIFFERENT SLOPES HAVE BEEN <br />CALCULATED USING SPENCER STABILITY ANALYSES. BOTH DRY AND WET CASES (A 6 B) WERE ASSUMED. <br />SHEAR PLANE WAS ASSUMED TO DEVELOP IN COLLUVIAL SOILS. SHEAR STRENGTH OF COLLUVIAL SOILS: <br />�= 30 °. C =0• <br />2. FACTOR OF SAFETYF = 1.5WAS <br />SSELECTED DEFINE THE CRITICAL SLOPE OF THE PILE FOUNDATION, <br />WET IONS (CURVE <br />3. CRITICAL FOUNDATION SLOPE OF 160 WAS ESTIMATED. <br />4. PILE PORTIONS DEPOSIT ED OONF SLOPES 10FLATTER THANE THE THAN <br />CRITICALC SLOPE AL SLOPE W E REMOVED. <br />WILL BE EFT IN PLACE. <br />ESTIMATION OF MAXIMUM ALLOWABLE SLOPE <br />FOR PILE FOUNDATIONS <br />1. THE EXTENT Or REMOVAL OF UNSTABLE EAST PILE PORTION IS SHOWN ON THE PLAN <br />VIEW AND 4 CROSS SECTIONS. <br />2. APPROXIMATE YARDAGE OF WASTE MATERIAL TO BE REMOVED IS 13,000 YD3. <br />3. THE WASTE MATERIAL SHALL BE STRIPPED TO THE ORIGINAL TOPOGRAPHIC SURFACE. <br />4. THE WASTE MATERIAL SHALL CE REDEPOSITED IN ANY AREA WITHIN THE LIMITS OF <br />THE WASTE PILES EXPANSIUNS DEFINED IN THE PLANS. <br />5. REDEPOSITED WASTE MATERIAL PILL BE SPREAD IN LAYERS NOT EXCEEDING 24 <br />INCHES IN THICKNESS AND COMPACTED BY THE CONSTRUCTION EQUIPMENT. <br />6. SUPERYISIUNNOFR THE PGEOTECHNIOCAL ENGINEER MATERIAL <br />R OR ENGINEERING RSTAFFNMEMBER. <br />1. THE SUPERVISOR WILL VERIFY THAT NO PILE PORTIONS ARE LEFT OK NATURAL <br />SL07ES STEEPER THAN 16 °. <br />B. IF TOPSOIL LAYER IS REMOVED DURING STRIPPING OF THE WASTE MATERIAL, NEW <br />TOPSOIL WILL BE PLACED ON SUCH LOCATIONS AFTER STRIPPING ACCORDING TO <br />COTTER CURRENT STANDARDS. <br />9. AREAS OF STRIPPING WILL BE VEGETATED FOLLOWING THE REMOVAL ACCORDING TO <br />COTTER CURRENT STANDARDS. <br />.iil 1 r <br />MINED LAND RE <br />Colo. Dept. of Natl <br />,off - GGv' I <br />A���� COTTER CORPORATION <br />MCDERMDENIGR. ASSOC. <br />INC. SCHWARTZWALDER fl7ilhlE <br />GEO HYDFO CONSU T.. WASTE PILE RECLAMATION <br />H- <br />PORTION OF EAST PILE <br />TO BE REMOVED <br />SCALE DATE SHT. NO. <br />1" = 50' 6/30/83 2 of 5 <br />Proj. No. 009 - 009 <br />IIgWI��� <br />204 <br />A NO GROUND <br />--F- <br />WATER PRESE <br />T <br />IN WASTE <br />MATERIAL <br />B <br />GROUNDWATER AS <br />OLD TOPOGRAPHIC <br />CRITICAL <br />SLOPE (160) <br />0.5 <br />0° <br />10° 20" 3u <br />SLOPE OF THE PILE FOUNDATION <br />3UMED 5 FT. ABOVE <br />SURFACE (PILE FOUNDATION) <br />NOTES: <br />1. FACTORS OF SAFETY FOP. A PILE DEPOSITED ON TOPOGRAPHIC SURFACES OF DIFFERENT SLOPES HAVE BEEN <br />CALCULATED USING SPENCER STABILITY ANALYSES. BOTH DRY AND WET CASES (A 6 B) WERE ASSUMED. <br />SHEAR PLANE WAS ASSUMED TO DEVELOP IN COLLUVIAL SOILS. SHEAR STRENGTH OF COLLUVIAL SOILS: <br />�= 30 °. C =0• <br />2. FACTOR OF SAFETYF = 1.5WAS <br />SSELECTED DEFINE THE CRITICAL SLOPE OF THE PILE FOUNDATION, <br />WET IONS (CURVE <br />3. CRITICAL FOUNDATION SLOPE OF 160 WAS ESTIMATED. <br />4. PILE PORTIONS DEPOSIT ED OONF SLOPES 10FLATTER THANE THE THAN <br />CRITICALC SLOPE AL SLOPE W E REMOVED. <br />WILL BE EFT IN PLACE. <br />ESTIMATION OF MAXIMUM ALLOWABLE SLOPE <br />FOR PILE FOUNDATIONS <br />1. THE EXTENT Or REMOVAL OF UNSTABLE EAST PILE PORTION IS SHOWN ON THE PLAN <br />VIEW AND 4 CROSS SECTIONS. <br />2. APPROXIMATE YARDAGE OF WASTE MATERIAL TO BE REMOVED IS 13,000 YD3. <br />3. THE WASTE MATERIAL SHALL BE STRIPPED TO THE ORIGINAL TOPOGRAPHIC SURFACE. <br />4. THE WASTE MATERIAL SHALL CE REDEPOSITED IN ANY AREA WITHIN THE LIMITS OF <br />THE WASTE PILES EXPANSIUNS DEFINED IN THE PLANS. <br />5. REDEPOSITED WASTE MATERIAL PILL BE SPREAD IN LAYERS NOT EXCEEDING 24 <br />INCHES IN THICKNESS AND COMPACTED BY THE CONSTRUCTION EQUIPMENT. <br />6. SUPERYISIUNNOFR THE PGEOTECHNIOCAL ENGINEER MATERIAL <br />R OR ENGINEERING RSTAFFNMEMBER. <br />1. THE SUPERVISOR WILL VERIFY THAT NO PILE PORTIONS ARE LEFT OK NATURAL <br />SL07ES STEEPER THAN 16 °. <br />B. IF TOPSOIL LAYER IS REMOVED DURING STRIPPING OF THE WASTE MATERIAL, NEW <br />TOPSOIL WILL BE PLACED ON SUCH LOCATIONS AFTER STRIPPING ACCORDING TO <br />COTTER CURRENT STANDARDS. <br />9. AREAS OF STRIPPING WILL BE VEGETATED FOLLOWING THE REMOVAL ACCORDING TO <br />COTTER CURRENT STANDARDS. <br />.iil 1 r <br />MINED LAND RE <br />Colo. Dept. of Natl <br />,off - GGv' I <br />A���� COTTER CORPORATION <br />MCDERMDENIGR. ASSOC. <br />INC. SCHWARTZWALDER fl7ilhlE <br />GEO HYDFO CONSU T.. WASTE PILE RECLAMATION <br />H- <br />PORTION OF EAST PILE <br />TO BE REMOVED <br />SCALE DATE SHT. NO. <br />1" = 50' 6/30/83 2 of 5 <br />Proj. No. 009 - 009 <br />IIgWI��� <br />204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.