My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137331
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:59 PM
Creation date
11/26/2007 5:50:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001114
IBM Index Class Name
Permit File
Doc Date
1/30/2002
Doc Name
Rejected reclamation cost estimate
From
DMG
To
DMG
Section_Exhibit Name
Permit documents
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />sheet 1 of 2 <br />CIRCES Cost Estimating Software 1 <br />TRUCK/LOADER TEAM WORK ~ st ~ M ~~ ~~ Q/Al v ~- <br />(~/ ,...gip bae.k~; (1; nom, C-W.1~ h `~ <br />PROJECT IDENTIFICATION ~~~ ~"`V - 1 ~ ~~" ~'r ~"'~`- "~ ~ ~ b' ~ ' S''"V(~ <br />Agency or organization name :Colorado Division Of Minerals Antl Geology ('Q<Qc.~-~ea~ ~~ Q ~t9 <br />Task # : 002 State :Colorado PermiUjob # :M-2001.114 r~ <br />Date : 01/30/2002 CounTy : Larimer Abbreviation :none <br />User: ACS Site :Starks Quarry Filename :M714-002 <br />Permit or other job actlon :New application, sandstone quarry <br />Task description : Backfill highwall along southwest side o/ permit area using rubble <br />HOURLY EQUIPMENT COST Shifl basis : 1 per day <br />TrucWloader team -Truck :Generic 12-18 cy, 6x4 <br />-Loader :Cat 3458 L - VG Sedes ll <br />Support equipment -Load area <br />-Dump area <br />Roatl maintenance -Motor grader <br />-Water truck <br />U7H - 7SU <br />Cost Breakdown : Truck/LOad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Gratler Water Truck <br />Import data filename : truck2 excavate NA dozer NA NA <br />Utilization-machine: 84 100 NA 100 NA NA <br />-Ripper attachment : NA ~ NA NA 30 NA NA <br />Ownership cosVhour : $20.12 $55.71 NA $43.32 NA NA <br />Operating cosUhour: .$22.39 $SZBB NA $49.44 NA NA <br />Ripper op. cosVhour. NA NA NA $1.82 NA NA <br />Operator cosVhour : $23.61 $28.18 NA $2799 NA NA <br />Unit SUbtOtals: $66.12 $141.77 NA $122.57 NA NA <br />Number of units: 3 1 0- 1 0 0 <br />Group subtotals : Work : $340.14 Support : $122.57 Maintenance : $0.00 <br />Total work team cosUhour : $462.71 <br />Initial Swell <br />volume: 50,000 CCY factor: 1.335 <br />Sourco of quantity take-off :see notes <br />Source of estimated swell factor :CIRCES s <br />Material purchase cost : $0.00 <br />HOURLY PRODUCTION <br />Truck Caoaclri <br />Truck Payload (weight) Basis <br />adsheet swell table -sandstone <br />/LCY Total cost <br />Truck Betl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume <br />Descr.: Sandstone Heaped volume <br />Rated payload : 48,000 pounds Average volume <br />Payload capacity : 18.82 LCY Adjusted capacity <br />Final adjusted truck capacity based on specific number of loader passes <br />oading 7001 Ca a~ri .. <br />Rated capacity (nom. heaped) : 4.420 LCY <br />Descr.: Blasted rock -poorly blasted (60 - 75 <br />Bucket fill factor : 0.675 <br />Adjusted bucket capacity : 2.984 LCY <br />Loose <br />volume: 66,750 LCY <br />Truck <br />Altitude adj.: 1.000 <br />Job efficiency : 0.830 <br />Ne[ correction : 0,830 <br />$0 <br /> <br />12.00 <br />18.00 LGY <br />LCY <br />15.00 <br />15.00 <br />14.92 LCY <br />LCY <br />LCY <br />Site altitude (tt.) <br />Loader S <br />1.000 (G <br />0.830 (1 sl <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.