Laserfiche WebLink
Appendix B -Reclamation Cost Estimate <br />12 Geotech Holes <br />4.75" Open Holes <br />Track Mounted Rig <br />Hole Hole De th <br />12 Geotech Holes 600 <br />otal Lineal Feet 600 <br /> Reclamation Estimate <br />Item Quantit Unit Unit Price Total <br />Bottom Plu O Each $144.80 $ - <br />7' Cement in each hole 10 Ba s $8.25 $ 82.50 <br />Cut Casin at Surface 0 LF $11.40 $ - <br />Borehole Marker 12 Each $3.56 $ 42.72 <br />Drill Ri Time - Re lace Cuttin s 12 Hour $120.00 $ 1,440.00 <br />ater Truck Time 0 Hour $41.55 $ - <br />Reclaim Road O LS $0.00 $ - <br />Re lace To soil on Roads 0 CY $0.00 $ - <br />e etation O Acre $ - $ - <br /> <br />Subtotal $ 1,565.22 <br /> <br />Burden 25% $ 391.31 <br /> <br />otal Reclamation Estimate $ 1,957 <br />