My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137261
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:55 PM
Creation date
11/26/2007 5:46:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
Permit File
Doc Date
1/14/1998
Doc Name
DRAFT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/14/199 11:17 4522759 _ _ _ niTTLE APPLEGATE INC PAGE 02 <br />f R • III IIIIIIIIIIIII III • <br />999 <br />DRtiFT <br />i <br />CONDITION OF PERMIT APPROVAL <br />BASELINE RESOURCES; HALL IRWIN CONSTRUCTION COMPANY <br />Wi 30 afte the is ce of a Re lions r~i't or by MJ~1Ati~~~ <br />whichev occurs fi a Operator wi ovide to , Gone of the fo ms to <br />iri orate s wal ~ to eclanaati p ~ <br />1. Provide an alternate reclamation plan which shows Phase 2 and 3 as groundwater lakes in <br />the event that the slurry wall fails. The Operator will show evidence of suieat water ' r~'' " `-' <br />rrighf * _~rr anomentatinn of th ~~--and ]an <br />W'b~~ D .S ~t~ ~C7iuu~~ tS ~i i ~l-~.. uSe- Q ~" la r <br />~K,('~°sk,re. et- g ic- ~1~..-a~5 ~ o r 3. <br />2. Provide a design for the slurry wall done by a registered professional en ineer. This <br />design will be incorporated into the permit as a construction quality ~ "" "~'""-`I u and <br />will be enforceable by DMG. Also the Operator will provide a monitoring program <br />during the construction of the slurry wall to assure it is constructed according to plan and <br />will provide a testing program to determine if the reseweir-is Sl~r1~; <br />standards af-tlt .The Operator will provide a Financial Warranty ~ <br />.y For the amount of 25° ° of the constructio cos of the slurry wall. IJa ~-' <br />~~ ~ 4,as2~ w i ~ I ~eN.- ri`-,r `~ ~~ ~s~-~+-~ , ~~-`~~(wT,l t~4)- v - <br />2. rovide a Financial Wancaaty in an amount sufficient to backfill Phases 2 and 3 with "'r' <br />en and ' ert aterials in the event that the slurry wall fails. a- <br />4. Provide a Fr~nancisl~io cov~s~$ie`cos~cor~truction~f the slurry wall in the ~~ <br />even~sltat DMG is required to complete the slurry wall. ~~ °',K~ / r <br />Nom" . ~ ` ~e~`,.~^~'I <br />I fit"'"~ <br />®M~, .~ <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.