Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006003
IBM Index Class Name
Permit File
Doc Date
1/6/2006
Doc Name
New 112c Appl.
From
Hall-Irwin Corporation
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L -RECLAMATION COSTS <br />The information provided in this Exhibit is intended to satisfy the requirements outlined in Section <br />6.4.12 of the Colorado Mined Land Reclamation Board Construction Material Rules and <br />Regulations: <br />We have selected the phase of the mining that includes the largest area disturbed atone time to <br />calculate the potential reclamation liability. This will occur during Phase 2. Assuming the entire <br />Phase is mined, with no reclamation. Although Phase 3 has larger surface area, this Phase would <br />be mined at a 3:1 slope and therefore at any time during mining, would not hold the greatest <br />liability for reclamation. <br />^ Phase 1 would be 100% mined and 90% reclaimed. Phase 1 would be completely <br />backfilled to rough finish grade. Phase 1 would require final grading, topsoil placement, <br />seed and mulch. <br />^ Phase 2 would be 100% mined and 0% reclaimed. Phase 2 would require backfill to rough <br />finish grade (estimated to be 30 feet deep based on bore logs), final grading, topsoil <br />placement, seed and mulch. <br />^ Phase 3 would be 0% mined and therefore no reclamation is required. <br />^ The Landscape Sales Yard includes the scale, scale house, access road and landscaping <br />materials. The scale, scale office, and landscape materials are saleable and therefore no <br />cost for reclamation. The foundation for the scale and office will require demolition. The <br />area will require topsoil placement, seed and mulch. <br />^ Although Phase 3 will not be mined at this stage, the slurry wall surrounding Phase 3 is <br />proposed to be installed prior to exposure of groundwater. Therefore we request the <br />option for 20% bonding of this cost. <br />^ There is no processing activity proposed at this site, therefore no associated reclamation. <br />Please refer to the attached table for estimates of quantities and associated costs. <br />Hall-Irwin Corporation - ParkerlDersham Sand and Gravel Mine - MLRB 112 Permit Application <br />Exhibit L -1 <br />