Laserfiche WebLink
III IIIIIIIIIIIII III Doc Date:12/11/2001 <br />sss <br />• ~~ <br />~~' SECT'ION 6.0 Livestock Pond Coestructioe Through 1992 aed <br />Proposed Approximate Locations for 1993. <br />This section updates the OMLR on the locations of all constructed livestock ponds at Trapper Mine through <br />1992 and projects approximate locations for proposed poud construction in 1993 (see attached maps). The <br />average pond density for Trapper mined-land areas will not exceed one pond per ten acres, the density <br />specified by the approved permit Table 6-1 descnbes the as-built pond density in association with the spe- <br />cificdrainage areas. <br />In 1992, no new livestock ponds were built However, Trapper cleaned or partially cleaned 33 previously <br />constructed ponds. <br />Enclosed map Crl also shows proposed pond locatious that maybe constructed by Trapper to accommodate <br />the optimum density for lives[ock/wildlife use on the reclaimed area. Approximately ten ponds are pro- <br />posed for construction in 1993 and should be completed by October 31st Table Cr2 descnbes the projected <br />approximate drainage area per pond following conswction in 1993. <br />As has been the case with previous livestock pond construction, future stock pond construction will meet or <br />exceed most state and federal standards and specifications. Beginning in 1991, all constructed stock ponds <br />will be inspected by representative S(S personnel or a qualified impoundment inspector and appropriate <br />• correspondence forwarded to the Division in our annual report <br />[CASLRD\92REPT6] <br />• <br />