Laserfiche WebLink
<br />EXHIBIT B <br />Re: Mining Plan <br />Methods to be employed: removal of surface soil (boles sand) <br />by front-end loader. <br />Equipment to be utilized: front-end loader and dumptruck. <br />Phases of Operation: The operation involves the leveling of <br />a hill. Due to the type of surface soil involved ( i.e., the sandy <br />make-up of the soil ) it is possible to remove the material only <br />during the winter months when the soil is frozen. Accordingly the <br />operations occur during the months of November through approximately <br />March of each year. <br />Stages: During the year 1979-1980 approximately 50 loads <br />of sand where removed. During the year 1980-1981 it is estimated <br />that the same amount of material will be removed. <br />