My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137012
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:38 PM
Creation date
11/26/2007 5:25:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
7/30/2007
Section_Exhibit Name
Section 2.05.4(2)(c) Backfilling and Grading
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Postmining Pond Retention <br />As described in the Mine Facilities section, Pond 007 will be retained for use by the landowner and <br />the embankment of 5'h Street must remain for ongoing use of the road. See Attachment 2.05.3(3)- <br />16 Demonstration of Retention of Pond 007 for details <br />Pond 008 was constructed in an area which contained three small stock ponds on the Burbridge <br />property. The landowner has provided a letter stating that he would like Pond 008 to remain to <br />replace the three ponds which existed in the pre-mining condition. This letter is provided in <br />Attachment 2.05.4(2)(C)-4 at the end of this section. Compliance with Rule Rule 4.05.9(13) (a) <br />through (f) for pond retention after reclamation is enclosed in Attachment 2.05.3(3)-19. <br />Postmining Drainage Channels <br />• All major drainages in the New Horizon 2 area that are to be disturbed by mining activities will be <br />reclaimed to approximate the premining configuration and to blend with the undisturbed drainage <br />above and below the area to be reclaimed. Two pre-mining channels are encountered and <br />restored. These are called the Krill Channel on the easternmost portion of the mined area and the <br />San Miguel Channel which drains into the reclaimed area of Pond 007. Both of these channels are <br />shown on Map 2.05.3(3)-1 Surface Hydrology. The Postmining drainage channels will be designed, <br />constructed, and maintained to the following specifications: <br />1. Gentle sloping banks which shall be stabilized by vegetation; <br />2. Prevent additional contributions of suspended solids to streamflow and to runoff <br />outside the permit area; <br />3. Blend with the undisturbed drainage above and below the area to be reclaimed; <br />4. Safely pass the runoff from a 10-year, 24-hour precipitation event. <br />• (Revised July 2006) 2.05.4(2)(c)-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.