My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136977
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:36 PM
Creation date
11/26/2007 5:21:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
VII. PERFORMANCE STANDARDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2 %~ADS (4.03) <br />The construction and design of the haulroads was. discussed in <br />Section V. The roads have been designed using the best technology <br />currently available in order to afford environmental safeguards. <br />The haulroads will be reclaimed after they are no longer used for <br />hauling of coal or overburden. The haulroad loading into Section 22 will <br />be left to provide access to the southeastern portion of the surface <br />owners property. This has been approved in Permit Number 79-53. <br />The haulroads have been located on the stable slopes within the <br />area in order to decrease the amount of erosion associated with the <br />haulroad. The road grade will not exceed the criteria set forth in Faale <br />4.03(3). All cut slopes will not be steeper than 1v:1.5h, please refer <br />to the Mine Plan Map for road locations. Upon ca~letion of the cut the <br />• outslopes will be stabilized with a vegetative cover. The area will <br />be seeded with western wheatgrass (5 lbs PIS/ac), streambank wheatgrass, <br />(5 lbs PIS/ac), and pubescent wheatgrass (5 lbs PIS/ac). This rate will <br />be doubled if broadcast or hydroseeded. <br />Prior to construction of any road embankment all woody vegetation <br />will be grubbed and the topsoil salvaged and stored in a topsoil stockpile. <br />No embanlarents will be placed on side slopes exceeding 20 percent. During <br />construction of the embankment special attention will be kept to keeping <br />the fill free of organic material as is reasonably possible. likewise, <br />acid or toxic forming materials will not be used as fill material. The <br />embankment will be constructed in four foot lifts with adequate ooi~action <br />of the material resulting from the traversing of the fill by the haul <br />trucks and dozers. After the embankment has been constructed the outslopes <br />C~ <br />VII-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.