• The truck would be filled in three passes by the front-end loader at the <br />portal bench during that backfilling phase. Since the loader will be working in <br />conjunction with the tractor on an intermittent cycle, the truck loading costa can be <br />absorbed as dead time for the loader. <br />Grading <br />A limited amount of final surface shaping will be performed with a <br />conventional road grader. This will occur at the truck scale site since the tractor <br />or ac raper will be available at other sites where grading is necessary. A Cat <br />Model 14, or equivalent model, will be rented for this purpose. A scarifier equipped <br />unit will be used in order to prepare sub-soil surfaces for the application of <br />topsoil or SPGM. <br />It is expected that a grader can accomplish the required work at the scale <br />site in four hours, including [ravel time to and from the job site. Recently quoted <br />rates are $55.00 per hour. (Cost: 4 x $55/hr = $220.) <br />• Overburden Packi <br />This function will largely be performed as an adjunct to tractor and <br />scraper traffic during deposition of backfill material upon the portal bench, access <br />roads and sediment ponds. The grader can adequately accomplish necessary compaction <br />at the truck scale pit. The cost shown in Table RP-1 is a factor of 10% of the <br />backfilling coat of portal bench and access road, to account for slowdown and care to <br />ensure packing by the transport equipment. <br />Hydroseeding and hydromulching costa were obtained from verbal contractor <br />quotations for the supply and use of applicable equipment and equal $1,000 per acre. <br />Drill seeding and mulching costs were also obtained from the contractors' <br />verbal quotations, also costs $1,000 per acre. <br />Planting of containerized shrubs (10,800 units) cost is based upon ARCO <br />• Mt. Gunnison mine estimates and amounts to $11,000. <br />114v (Rev. 1-13-82) <br />