My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136812
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:26 PM
Creation date
11/26/2007 5:10:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Appendix 9-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 9(51 page 3 <br />EARTHWORK: <br />1) Two main portals, belt portal, fan portal (5.5' x 13'): <br />Portal buildings will be removed as described above. Portals <br />will be backfilled with non-combustible dirt for a minimum of 25 <br />feet. Due to sloughing at the inby side of the backfill, <br />approximately 15 feet of additional fill dirt will be added to <br />support the fill flush caith the top of the tunnel. This <br />additional fill repose angle will be about 45 degrees (Approx. <br />3500 LCY). <br />ISee CDMG Estimating Form 1/10/94, Filename GU35-2 & C035-5, <br />Appendix 9(2)1 <br />............... $2800.00 <br />2) Hauling and spreading 14500 LCY of fill material over the waste <br />pile area. <br />(See CDMG Estimating Form 1/10/94, Filename 0035-1 & C035-3, <br />Appendix 9(2)) <br />............... $7941.00 <br />3) Hauling and creating a 2:1 slope at the tipple area. 7500 LCY. <br />fSee CDMG Estimating Form 1/10/94, Filename C035-4 & C035-8, <br />Appendix 912)) <br />............... $5475.00 <br />4) Hauling and spreading 7400 LCY of topsoil at the tipple area. <br />(See CDMG Estimating Form 1/10/94, Filename G035-6 & 0035-9, <br />Appendix 9(2)) <br />• ............... $4896.00 <br />5) Hauling and spreading 4800 LCY of topsoil at the waste pile. <br />ISee CDMG Estimating Form 1/10/94, Filename C035-7 & C035-11, <br />Appendix 9(2)) <br />............... $2536.00 <br />6) Design and installation of permanent drainage channel to replace <br />underground culvert system that originates at the south end of the <br />mine yard. To be installed after backfilling and grading have been <br />accomplished. Local backhoe contractor, Gene Strever, has estimated <br />an average cost per foot for a 2' deep by 3' wide ditch with 2:1 <br />slopes at $1.25/linear foot. This channel will be approximately 800 <br />feet long. Add $500 to line channel with appropriate rip-rap. <br />............... $1500.00 <br />REVEGETATION: <br />(See CDMG Estimating Form - Revegetation Work 9/21/93, Filename <br />C035-1, Appendix 9(2)) <br />............... $4247.00 <br />Topsoil Borrow Area (1.5 Acres) ....................... $ 800.00 <br />Subtotal :....................................................... $45440.00 <br />Contractor's Overhead and Profit (12.525% of dir.) .............. $ 5591.00 <br />CDMG Contract Administration Expenses (4.25% of dir.l........... $ 1897.00 <br />-------------------------------------------------------------------------- <br />~Total. Reclamation Project Cost : ............................... $52,928.00 <br />May 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.