My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136691
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:19 PM
Creation date
11/26/2007 4:59:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978304
IBM Index Class Name
Permit File
Doc Date
10/16/1978
From
ENVIRONMENT INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--~ • • <br />~,. <br />Mr. Roger S, Funston <br />Mined Land Reclamation Division <br />October 16, 1978 2 <br />c. If the staff pays $10 per hour for labor, the whole division <br />meeds to be investigated. We must stay with $6.00 per hour, <br />and feel it is probably on the high side. <br />d. We feel that staff, in doubling the amount of seed to be <br />used, has incorrectly changed this area from non-critical <br />desert to a critical area. We have no objection to the <br />staff second guessing the SCS as to the seed mixture, but <br />protest the amount of seed recommended. Reference is made <br />to the second page of the staff letter to confirm our <br />contention. Therefore, we revise and recommend a program <br />using the staff seed mixture except in amounts appropriate <br />to a non-critical area. We assume that by accepting the <br />staff change in mixture, the division guarantees the results. <br />Grass seed mixture - 6.75 lbs./ac. @ $1.26/lb. _ $ 8.50 <br />Fertilizer = 15.70 <br />Labor at $6.OOjhour for 8 hours = 48.00 <br />Per Acre Total $72.20 <br />Therefore <br />Revegetation 6.1 ac. at $72.20/acre =$440.42 <br />Final grading and seed mixture drilling 6.10 <br />ac. @ $40.00/acre = 244.00 <br />Slope grading and reshaping 1.79 ac. @ $80/ac. = 143.20 <br />Total Reclamation Costs - Phase I and Phase II =$827.62 <br />Our recommendation for a bond of $800 remains unchanged. <br />We have no other choice but to contest staff's conclusion <br />and recommendations at the time of the hearing before the <br />board. <br />Sincerely, <br />LEO:cm <br />ENVIRONMENT, INC. <br />~~ ~ <br />Larry E. O'Brian <br />
The URL can be used to link to this page
Your browser does not support the video tag.