My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136653
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:17 PM
Creation date
11/26/2007 4:58:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 13 DRAINAGE AND SEDIMENT CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• and ability, slope and surface stability, adequacy in height, size and shape <br />to provide sufficient volume for sediment and detain water and selection of <br />proper spillways and outlet devices, passing of design storm events and proper <br />outflow rates. The pond has been designed under the direction of a qualified, <br />registered Professional Engineer. <br />The purpose of the sedimentation pond is to not only provide a final measure <br />to prevent additional contributions of sediment outside the mine area, but <br />also to provide a means of compliance with all applicable effluent <br />limitations, especially with respect to total suspended solids. <br />The engineering parameters and supporting calculations for the sediment pond, <br />permanent channel, diversion ditches and culverts are included following this <br />• narrative discussion. The locations of the drainage control structures are <br /> shown on the Mine Facilities Map (Map 12). <br />Sedimentation Pond <br />Pond Design <br />The plan view design of the new sedimentation pond to be constructed at the <br />Coal Gulch operation is shown as Figure 1, Sediment Pond Design - Plan view. <br />A cross section showing the sedimentation pond with details of the embankment <br />height, principal spillway and emergency spillway is set forth as Figure 2, <br />Sediment Pond Design - Cross Section. <br />• <br />Revised 9/12/86 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.