My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136650
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:17 PM
Creation date
11/26/2007 4:57:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980120
IBM Index Class Name
Permit File
Doc Date
1/22/2004
Doc Name
SEO Compliance
From
Weld County
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/20/2004 12:30 970-330-4546 CCWCO PAGE 02 <br />C~C~Mn9C~D <br />Mr. CrtegNelson <br />weld Cotmty Public Works <br />P.O. Box 758 <br />(3reetey, CO 80632 <br />Mr. Nelson <br />central Colorado water <br />conservancy district <br />3203 West 28th Street <br />Greeley, Colorado 80634 <br />(970) 330-4540 • Metro (303) 825-Od74 <br />FAX (970) 330-4546 <br />January Z0, 2004 <br />Central is in the process of having a slurry wall test completed by Tetra-Tech, Inc. <br />for the 83rd Avenue Pit. This work is proposed to be completed by early spring 2044. <br />Tetra-Tech, Hall-Irwinand/or Cantrai's office will keep yon current with say <br />correspondence between parties during the test period. <br />The Koenig Pit aesr Platteville has a large amouai of material left to be mined. <br />A test on this pit will be conducted within the next few months. Currently we are Iaoking <br />at using test wells on either side of the slurry wall to determine change in groundwater <br />elevation. <br />water storage firm the IGcenig Pit even in is cuurent configuration is valuable to <br />replace depletions caused by Central's member well pumping. 'T'his water source helps <br />keep irrigated apiculture viable. <br />I hope this addresses yow questions regarding Central's slurry wall test plans. If <br />you have any questions, please feel free to contact nte. <br />Sine-erely2 _ <br />randy w. ray <br />CCWCb Operations Manager <br />Ce: Colby Hayden (Teas Tech RSN ) <br />Adam Mack -Hall-Irwin <br />
The URL can be used to link to this page
Your browser does not support the video tag.